ROADWAY ACTIVITY REPORT FOR THE LOWER EAST AND UPPER CUMBERLAND
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Paving operations are ongoing throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. The contractor has closed North Grace Hill Drive at the existing intersection of SR-28 (US-127) for construction activities. Motorists should utilize South Grace Hill Drive as the detour with appropriate signs. Traffic moved to temporary alignment on Plateau Road and permanent alignment on Potato Farm Road. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution while traveling through the work zone.
[Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY SR-1 (US-HWY. 70 W.) Utility Work both directions from LM 24 to LM 26: Flagging operations on SR-1 (Rockwood-Crossville Hwy) from East of Cox Valley/I-40 overpass to East of Mackie Road. Motorists should reduce speed and be prepared to stop. Trucks signage, flaggers, and barrel/cones will be present. 09/05/24 through 11/30/24 from 8 am to 3 pm. (2024-421)
CUMBERLAND COUNTY SR-28 (US-127 S.) TDOT Bridge Inspection both directions from LM 30.5 to LM 30.52: TDOT Maintenance will be performing lane closures for bridge inspection at the 30.52 MM on SR-028, both directions. Lane closures will begin on 11/19/24 at 8 AM with and expected duration of 3 hours. Motorists are advised to use caution while traveling through the work zone.
CUMBERLAND COUNTY SR-68 Utility Work both directions from LM 4.81 to LM 12.44: Intermittent stoppages as well as shoulder and lane closures on SR-68 from Cox Valley Road to Old Grandview Hwy. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 08/29/24 through 11/30/24 from 9 am – 2 pm. [2024-152]
CUMBERLAND COUNTY SR-1 (US-70) construction of bridge over the Obed River (LM 12.7): Bridge replacement activities continue on SR-1 (US-70) over the Obed River bridge. SR-1 (US-70) is to be closed at the bridge for the duration of the project until the work is completed. A detour with signs has been displayed to utilize Northside Drive (SR-462) to travel around the closure. Additionally, the left turn from Sparta Drive onto Miller Avenue (SR-392) has been closed for the duration of the project. Motorists should be aware of the road closure and utilize the detour route as necessary. RESTRICTIONS: Bridge on SR-1 (US-70) over the Obed River is being replaced. The road is closed at LM 12.72. [Whaley Construction, LLC/Crossville/CNX110]
CUMBERLAND COUNTY SR-28 (Main Street, US-127) downtown pedestrian improvement project between Lantana Road (Highway 70 East) and Neecham Street: Construction activities are ongoing along SR-28 (Main Street). The contractor is working on removing and replacing the concrete sidewalk and curb ramps from East First Street to East Fifth Street. The shoulder parking along this area has been closed. Lane closures may be required at times for construction activities. Signs and flaggers may be utilized during these lane closures and/or lane shifts. Motorists should use caution when traveling through the work zone.
[Adams Contracting, LLC/Crossville/LP24_1]
CUMBERLAND COUNTY SR-28 (US-127) grading, drainage, signals and paving from SR-68 to south of the bridge over Byrd’s Creek (LM 9.7 to LM 10.6): Construction activities are in progress along SR-28 and SR-68. All lanes of traffic are open. Construction equipment and vehicles will be entering and exiting the work zone frequently. The signals at the intersection of SR-28 and SR-68 are operational. Motorists should be mindful of the change as they travel along SR-28 and SR-68. Flaggers may be utilized at times. Motorists should use caution when traveling through the area and be aware of the new traffic pattern.
[Cleary Construction, Inc./Crossville/CNW231]
CUMBERLAND COUNTY SR-299 repair of bridge over I-40 MM 338.5 (LM 2.8): Construction activities ongoing in the area. The temporary traffic signal on SR-299 is active and traffic crossing the bridge is reduced to one lane. The contractor will be working on the bridge deck, shoulders, and slopes of SR-299. Possible temporary flagging operations are needed for construction activities.
[Jamison Construction, LLC/Crossville/CNY062]
CUMBERLAND COUNTY SR-462 from SR-28 (US-127N / LM 3.1) to SR-298 (Genesis Road / LM 4.6) in Crossville: Construction and paving activities are in progress. The right lane of SR-28 South bound is to be closed during the day, while paving. Old Jamestown Highway south of Interstate Drive is closed at the intersection. A detour route is installed directing traffic around the closure. Activities will require temporary lane closures and/or traffic stoppages on Interstate Drive (SR-462), as well as short term closures of city streets. Flagging operations will accompany these closures with appropriate signs. Motorists traveling west on Interstate Drive should be mindful of the “Right Turn Only” lane at the intersection of Stout Drive. Motorists should use caution when traveling through the work zone as traffic patterns change.
[Rogers Group, Inc./Crossville/CNV010]
DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor continues grading and construction activities throughout the project. Temporary lane closures and periodic traffic stoppages will be necessary for construction activities and motorists should be prepared to stop while traveling through the work zone. Motorists are encouraged to obey posted speed limit and to watch for construction equipment and personnel adjacent to the roadway. The West end of Old Liberty Road will be closed to through traffic due to construction activities. Motorists and EMS will need to use the East entrance of Old Liberty Road to gain access and follow detour signs.
[Twin K Construction/Cookeville/CNV012]
OVERTON COUNTY SR-136 (STATE HWY. 136) TDOT Bridge Inspection southbound from LM 3.74 to LM 5.26: Routine Bridge Inspections of the SR136 bridges over Roaring River and Flatt Creek will be conducted on Tuesday, November 19, 2024, from 8:30 AM until 3 PM. One lane will be closed at all times during the inspection. Flaggers will be present to direct traffic through the workzone.
OVERTON COUNTY SR-52 (JAMESTOWN HWY.) TDOT Bridge Inspection westbound at LM 21.71: A Routine Bridge Inspection will be conducted on the SR 52 bridge over the West Fork Obey River on Wednesday, November 20, 2024, from 8:30 AM until 1 PM. The westbound lane will be closed during the inspection. Flaggers will be present to direct traffic through the work zone.
PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Pigeon Roost Creek Road and Messenger Road remain closed, at the intersection of SR-136 with detour signs to utilize West Davis Road and Bunker Hill Road. In addition, the turning lane serving Prescott South Middle School has been taken out of service and northbound Jefferson Avenue will be restricted to one lane. Motorists are encouraged to use caution while traveling through the work zone and be aware of construction personnel.
[Rogers Group, Inc./Cookeville/CNV284]
PUTNAM COUNTY SR-136 (S. JEFFERSON AVE.) Utility Work southbound from LM 2.75 to LM 2.55: Southbound lane closures on SR-136 (S Jefferson Ave) between Scenic Drive and Interstate Drive. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 11/14/24 through 11/25/24 from 9 am – 2 pm. [2024-640]
PUTNAM COUNTY SR-24 (US-70N) bridge repair over Falling Water River (LM 24.4): The contractor will continue performing bridge repair work on SR 24 at LM 24.42. Motorists should be prepared to stop at the temporary traffic signal and should be aware of construction equipment and personnel adjacent to the roadway. One lane of SR 24 will remain open through the duration of this project; however, motorists should use caution as they travel through the work zone.
[Mid-State Construction Company, Inc./Cookeville/CNY066]
WHITE COUNTY SR-111 (STATE HWY. 111) Utility Work both directions from LM 7.00 to LM 14: Daily rolling roadblock between O’Connor Rd Exit to Old State Route 1 (McMinnville Hwy/South Mayberry Street) for aerial utility crossings beginning 11/14/2024 – 11/20/2024 from 8:30 am to 2:30 pm. Law enforcement, message boards, signage and trucks will be present. Motorists should slow down and be prepared to stop. [2024-122, 2024-128, 2024-160]
DISTRICT 28
BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road: The contractor will be performing grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone.
[Rogers Group, Inc./Dunlap/CNY153]
COFFEE COUNTY SR-2 (MURFREESBORO HWY.) Utility Work both directions from LM 6.0 to LM 7.12: Intermittent flagger assisted traffic stops along SR-2 (Murfreesboro Hwy) between Hurricane Road and Old Murfreesboro Rd. Motorists should reduce speed, prepare to stop and look for personnel. Trucks, signage, and barrels/cones will be present, 11/18/24 through 11/20/24 from 9 am – 2 pm. [2024-451]
COFFEE COUNTY I-24 (MM 105) construction of an overpass carrying SR-2 (US-41): Phase 1 of I-24 bridge replacement at Exit 105 will continue this week. SR-2 will be reduced to one lane utilizing traffic signal system. The temporary traffic signal will remain in effect until 10/16/25. On Tuesday 11/19 at 7 PM, SR-2 will be closed across I-24 with detours in place. This short closure is needed to move traffic safely over to the new bridge.
[Bell and Associates Construction, LP/Tullahoma/CNX309]
COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 1 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Contractor may use temporary lane shifts to complete utility work. Phase 1 traffic shift has reduced lanes from 3 to 2 across the bridge over Rock Creek in order to start bridge replacement work.
[Dement Construction Company, LLC/Tullahoma/CNX912]
COFFEE COUNTY SR-55 repair of the bridge over the Little Duck River (LM 14.0): Lanes are reduced to one lane in each direction across the SR-55 bridge over the Little Duck River for bridge repair work. This lane reduction will be in place until work is complete on 7/31/25.
[Mid-State Construction Company, Inc./Tullahoma/CNX412]
FRANKLIN COUNTY Old Decherd Road over Wagner Creek (LM 0.3) construction of a bridge: Old Decherd Road is closed at Wagner Creek for bridge replacement. A signed detour is in place. The road closure will be in place for the duration of the project through June 30th, 2025. RESTRICTIONS: Old Decherd Road at Wagner Creek is closed.
[Dement Construction Company, LLC/Tullahoma/CNY068]
FRANKLIN COUNTY SR-50 (US-64) repair of the bridges over Old Alto Highway (LM 16.9): Starting 09/18, lanes will be reduced on US-64/SR-50 to one lane in each direction for bridge repair work. The lane reduction will be in effect until project completion on 05/31/2025.
[Jones Bros. Contractors, LLC/Tullahoma/CNY097]
SEQUATCHIE COUNTY SR-8 (TAFT HWY.) Utility Work southbound at LM 3.9: Southbound lane closure on SR-8 (Taft Hwy) between Big Fork Rd and Browns Chapel Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 11/18/24 through 11/20/24 from 9 am – 2 pm. [2024-725, 2024-726]
WARREN COUNTY SR-1 (US-70S) bridge repair over SR-55 (LM 10.5): The contractor will have short term lane closures as needed for bridge repair operations. Under the bridge on SR-55 Bypass the portable barrier rail will remain in place long term, closing the outside shoulders under the bridge. Temporary lane and shoulder closures on and surrounding over and under bridge will also be utilized as needed with proper signing.
[Mid-State Construction Company, Inc./McMinnville/CNY196]
WARREN COUNTY SR-1 (US-70S) resurfacing from east of SR-288 (LM 18.5) to west of SR-136 (LM 23.1): The contractor will have lane closures and shoulder closures from 6 AM to 8 PM daily for project wrap up activities.
[Tinsley Asphalt, LLC /McMinnville/CNY121]
DISTRICT 29
BRADLEY COUNTY I-75 at Paul Huff Parkway Interchange modifications: During this reporting period, the contractor will continue work on new traffic signals. Intermittent flagging operations and temporary lane closures may be necessary. Motorists are advised to reduce speed and use caution in the work zone.
[Summers-Taylor, Inc./Cleveland/CNX362]
BRADLEY COUNTY I-75 resurfacing from south of MM 18.6 (LM 3) to north of Exit 20 (LM 5.4): During this reporting period, the contractor will be working on removing construction signs. Nightly lane closures will occur as needed between the hours of 7:00 PM until 6:00 AM. Motorists are advised to reduce speed and use caution in the work zone.
[Talley Construction Company, Inc./Cleveland/CNX405]
BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will continue grading work and install new curb & gutter. Asphalt paving is expected to begin. Intermittent flagging operations will take place throughout the project during various work activities. The speed limit in the work zone has been reduced to 35 mph. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Summers-Taylor, Inc./Cleveland/CNV130]
BRADLEY COUNTY SR-312 (HARRISON PK.) Utility Work both directions from LM 7.67 to LM 7.55: Flagger assisted westbound lane closure between Conner Rd and 700’ west of Westside Dr NW. Motorists should reduce speed and be prepared to stop. Flaggers, trucks, signage, and barrels/cones will be present, 09/16/24 to 11/24/24 between from 9 am – 2 pm. [2024-164]
BRADLEY COUNTY SR-311 resurfacing from SR-60 (LM 5) to SR-74 (LM 6.1): During this reporting period, the contractor will continue permanent pavement markings on SR-311. Intermittent flagging operations may be necessary around the work area. Motorists are advised to reduce speed and use caution in the work zone.
[Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-40 (US-64) resurfacing from SR-2 (US-11, US-64, LM 0.0) to near McKamy Street (LM 1.2): During this reporting period, the contractor is scheduled to continue permanent pavement markings on SR-40. Intermittent lane closures and flagging operations will be necessary during this work.
[Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-74 resurfacing from SR-311 (LM 12.7) to SR-40 (US-64, LM 13.9): During this reporting period, the contractor will continue permanent pavement markings on SR-74. Intermittent flagging operations may be necessary around the work area. Motorists are advised to reduce speed and use caution in the work zone.
[Wright Brothers Construction Company, Inc./Cleveland/CNX132]
BRADLEY COUNTY SR-74 to north of Inman Street (13.9) to north of SR-60 (15.5): During this reporting period, the contractor will complete punch list work on SR-74. Motorists are advised to reduce speed and use caution in the work zone. [Talley Construction Company, Inc./Cleveland/CNY095]
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly Lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. (Note: The contractor is currently scheduled to have nighttime lane closures on the ramp from I-24 East to I-75 North on Thursday (11/14) for guardrail repair. Also, on I-75 South on Monday (11/18), temporary closures are necessary to set beams on the new bridge being constructed on I-75 over the railroad south of the East Brainerd Road interchange.) It may also be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or to repair guardrail, attenuators, etc. Portions of the left lane on North and South Terrace between Belvoir Avenue and Spring Creek Road will be closed for installation of drainage structures, sanitary sewers, retaining and noise wall construction. (Note: Intermittent daytime non-rush hour lane closures, traffic shifts and flagging operations will take place Thursday (11/14) and Friday (11/15) on South Terrace and North Terrace to pave the approaches to the new bridges over I-24 on South Moore Road and McBrien Road.) All work is weather permitting. Moore Road and McBrien Road bridges over I 24 are closed as well as the entrance and exit ramps to I-24 between Belvoir Avenue and Moore Road. A continuous flow detour using Belvoir Avenue and Spring Creek Road is in place for local traffic. RESTRICTIONS: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed.
[Wright Brothers Construction Company, Inc./Maj Prj – Blevins/DB2101]
HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 17 to LM 18: Shoulder and lane closures on SR-2 (Lee Hwy) between Circle Drive and Hickory Valley Road. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 10/24/24 through 11/20/24 from 9 am – 2 pm. [2024-589 & 2024-617]
HAMILTON COUNTY SR-27 (ROSSVILLE BLVD.) Utility Work southbound at LM 7.35: Southbound lane closure on SR-27 (Rossville Blvd) between East 42nd Street and 7th Avenue. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 11/14/24 through 11/20/24 from 9 am – 2 pm. [2024-737]
HAMILTON COUNTY SR-29 (US-27) TDOT Bridge Inspection both directions at LM 9.67: A routine bridge inspection will be conducted on the SR 29 bridges over Levi Road from 8 AM until 3 PM on Thursday, November 14, 2024. One lane will be closed for the duration of the inspection.
HAMILTON COUNTY SR-58 (OCHS HWY.) Utility Work northbound at LM 2: Road Closure with detour on SR-58 (Ochs Hwy) between Alabama Avenue and W. 41 Street. Motorists should reduce speed and follow detour signs. Trucks, signage, and barricades will be present, 11/04/24 from 10 pm to 4 am on 11/20/24. [2024-714]
HAMILTON COUNTY SR-8 (RINGGOLD RD.) Utility Work northbound at LM 2.45: Northbound lane closure on SR-8 (Ringgold Rd) between East End Avenue and West End Avenue. Motorists should reduce speed and be prepared to stop. Trucks, signage, and barrels/cones will be present, 11/18/24 through 11/20/24 from 9 am – 2 pm. [2024-584]
HAMILTON COUNTY SR-8 (W. MAIN ST.) Utility Work both directions from LM 8.09 to LM 8.32: Nighttime road closure and detour on W. Main St between Market St and Broad St. Signage for detour route and barricades will be present. Detour will reroute traffic to 20th St beginning 09/04/24 to 11/20/24 from 10 pm to 4 am. [2024-527]
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps. There will be a potential lane closure on I-75 SB from 8 PM to 6 AM on 11/04/2024. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]
HAMILTON COUNTY Resurfacing on SR-29 (US-27) from south of Old Dayton Pike (LM 25.7) to north of Coulterville Road (LM 28.3): The contractor has completed resurfacing and will begin working on final cleanup. Intermittent lane closures maybe required to complete. Construction signs will remain until all work has been completed.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNY098]
HAMILTON COUNTY SR-317 (Apison Pike) improvement project from SR-321 (Ooltewah-Ringgold Road) to east of Layton Lane: Lane closures and flagging operations will be required on SR-317, Apison Pike, for bridge and grading work. The flagging operations will be performed on 11/14/24, 11/15/24, 11/18/24, 11/19/24, and 11/20/24 from 7 AM to 1 PM and 3 PM to 7 PM. Closures will last about 2 hours per location. The contractor will have intermittent flagging operations during daytime non-peak hours for bridge work, delivery of materials and equipment.
[Wright Brothers Construction Company, Inc./Chattanooga East/CNT336]
HAMILTON COUNTY SR-319 (Hixon Pike) miscellaneous safety improvements from Boy Scout Road (LM 8.5) to Thrasher Pike (LM 9.5): The contractor will be retrofitting curb ramps throughout the project limits. Daily right lane closures between 8 AM and 5 PM will be utilized to accomplish this work. Motorists should use caution as workers will be present. [J. M. Hanner Construction Co., Inc./Chattanooga West/CNY109]
HAMILTON COUNTY SR-58 resurfacing from SR-153 (LM 4.6) to near Eller Road (LM 6.5): Resurfacing operations have been completed. The contractor will begin working on final cleanup. Intermittent lane closures maybe required to complete this work. Construction signs will remain until all work is complete.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNY057]
HAMILTON COUNTY SR-8 (US-127) construction near Palisades Road (LM 15.2) to near Sunset Drive (LM 15.4): The contractor completed the slope remediation work. Minor road repairs are required, and signs will remain until this work is completed. [Wright Brothers Construction Company, Inc./Chattanooga West/CNW001]
MCMINN COUNTY SR-163 resurfacing from I-75 (LM 0.0) to near SR-2 (LM 2.4): During this reporting period, the contractor is scheduled to work on punch-list items on SR-163. Intermittent flagging operations may be necessary. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Rogers Group, Inc./Cleveland/CNY125]
MCMINN COUNTY SR-309 resurfacing from SR-2 (LM 0) to Near I-75 (LM 2.25): During this reporting period, the contractor is scheduled to work on punch list items on SR-309. Flagging operations will be necessary during work. Motorists are advised to use caution in the work zone and watch for flaggers assisting with traffic control.
[Rogers Group, Inc./Cleveland/CNY125]
MCMINN COUNTY SR-39 emergency sinkhole repairs at two locations near LM 4.2: During this reporting period the contractor will be continue roadway repair work on SR-39. SR-39 will remain closed near LM 4.20 for the duration of this project. [Talley Construction Company, Inc./Cleveland/CNY309]
MEIGS COUNTY SR-60 construction of a small drainage structure (L.M. 1.6): The culvert replacement has been completed and the long-term lane closure has been removed. Motorists should still use caution as the contractor completes cleanup, intermittent flagging operations are possible.
[Wright Brothers Construction Company, Inc./Chattanooga West/CNX408]
POLK COUNTY SR-68 construction of bridge over Brush Creek (LM 16.4): During this update period, the contractor will continue grading and bridge construction on the East side of SR-68. A temporary traffic signal system is active on SR-68 near LM 16.4. The northbound lane of SR-68 will be closed in the area controlled by the temporary traffic signal system. Motorists are advised to reduce speed and use caution in the work zone.
[Wright Brothers Construction Company, Inc./Cleveland/CNX347]
RHEA COUNTY SR-29 (US-27) resurfacing from north of Payne Lane (LM 11) to near Bradley Street (L.M. 14.6): The contractor has finished the resurfacing work and has some minor cleanup. Intermittent temporary lane closures are possible to complete the work. [Rogers Group, Inc./Chattanooga West/CNX219]
REGION WIDE
REGION 2 The crack sealing at various locations on various State Routes: There will be mobile closure operations for crack sealing work across the region. During this period, work is expected to take place in Coffee County.
[Reynolds Sealing and Striping, Inc./Tullahoma/CNY123]
REGION 2 The on-call concrete pavement repair at various locations on various Interstate and State Routes: Materials Co. will be repairing concrete pavement in Cumberland County in Crossville on I-40 at exits 320, 322, and 329. Various ramps require repairs and during the repairs half the ramp widths will be closed leaving a minimum of 10-foot lanes open to traffic. Please use caution when driving through the work zones.
[Vulcan Construction Materials, LLC/Dunlap/CNX411]
REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed.
[Cumberland Guardrail, Inc./McMinnville/CNY105]
REGION 2 The random on-call attenuator repair on various Interstate and State Routes: The contractor will soon schedule attenuator repair work at I-124 South MM 0.225 to I-24 east and Broad Street split. Exact time and date will be reported upon contractor’s decision.
[LU, Inc./McMinnville/CNY104]
REGION 2 The retracing of pavement markings with spray thermoplastic and random on-call pavement marking on various Interstate and State Routes: The contractor will be restriping pavement markings in Hamilton County along US 27 at Morrison Springs Road, 4th Street Northbound exit in downtown, and along the Olgiati Bridge. The contractor will also be restriping pavement markings at various locations along SR 2 and SR 317 in Hamilton County. During this work, the contractor will be using a mobile work zone operation, but intermittent lane closures are possible. Motorists are encouraged to use caution and watch for construction equipment and personnel adjacent to the roadway.
[Reynolds Sealing and Striping, Inc./Cookeville/CNY055]
REGION 2 The random on-call cable barrier repair on various Interstate and State Routes: The contractor may have short term shoulder closures in order to perform cable rail repair. Both travel lanes will always remain open to traffic on the interstate during any daytime work that is performed. Nighttime closures will be needed occasionally and will be worked nightly Sunday through Thursday from 7 PM to 6 AM as needed.
[Tennessee Guardrail, Inc./McMinnville/CNX312]
RESTRICTIONS
CUMBERLAND COUNTY – CNX110: Bridge on SR-1 (US-70) over the Obed River is being replaced. The road is closed at LM 12.72.
FRANKLIN COUNTY – CNY068: Old Decherd Road at Wagner Creek is closed.
HAMILTON COUNTY – DB2101: Moore Road and McBrien Road over I-24 closed. I-24 Ramps between Belvoir and Moore Road closed.