TDOT TO HALT HIGHWAY CONSTRUCTION FOR HOLIDAY TRAVEL PERIOD

Road construction won’t delay travelers during the Christmas and New Year’s holidays. The Tennessee Department of Transportation (TDOT) is once again halting all lane closure activity on interstates and state highways in anticipation of higher traffic volumes across the state. No temporary lane closures will be allowed for construction on Tennessee roadways beginning at 6 a.m. this Friday (December 22, 2023) through 6 a.m. on Tuesday, January 2. 

AAA expects an estimated 2.7 million Tennesseans to travel between December 23 and January 1 with most of them driving.

Except for a few long-term closures that must remain for safety, all construction-related closures will be suspended during the holiday period. Workers may still be on-site in some construction zones. Drivers should obey all posted speed limits, particularly in construction areas. Slower speeds are necessary in work zones due to the temporary layout of the roadway and will be enforced. Drivers convicted of speeding through work zones where workers are present face a fine of $250 to $500, plus court fees and possibly increased insurance premiums.

Get the latest construction activity and live streaming SmartWay traffic cameras from your desktop or mobile device at www.TNSmartWay.com/Traffic. Travelers can also dial 511 for statewide travel information.

 



UPCOMING EVENTS

No Events

CONTACT INFORMATION

3B Media
105.7 The HOG / Spirit 101.9/ 93.3 The Ranch
94.1 The VIBE / 98.9 The WOLF
37 South Drive
Crossville, TN 38555

Phone: 931-484-1057
Fax: 931-707-0580