October 3, 2025 in Top Stories, Traffic & Road Conditions

T.D.O.T. ROADWAY ACTIVITY REPORT (OCT 2-8)

ANDERSON COUNTY, SR 61 between Bill Key Lane and Old Batley Road: Motorists should be alert for possible daily lane closures during daylight hours through this construction project. Motorists should be alert for slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

ANDERSON COUNTY, SR 61 between SR 62 and SR 95: Motorists should be alert for possible daily lane closures between the hours of 9 a.m. and 3 p.m. through this resurfacing project. Motorists should be alert for slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

ANDERSON COUNTY, US 25/ SR 9 between Church Street and Cullom Street: Motorists should be alert for partial road closures with detours in place as utility crews perform work in this area. Motorists should be alert for workers present, follow signed detours, and use extreme caution through this area.

 

BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road: The contractor will be performing grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone. [Rogers Group, Inc./Dunlap/CNY153]

 

BLOUNT COUNTY, SR 162 Pellissippi Parkway between Cusick Road and SR 33: SR 162 is reduced from two lanes to one through this project as construction crews perform bridge work in this area. Motorists should be alert for possible brief rolling roadblocks between the hours of 9 a.m. and 3 p.m. daily, as needed, for blasting operations. Motorists should be alert for changed conditions, workers present and use extreme caution through this area.

 

BLOUNT COUNTY, SR 336 between US 411 and Reagan Mill Road: Motorists should be alert for possible daily lane closures between 8 a.m. and 5 p.m. through this resurfacing project. Motorists should be alert for workers present, slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

BLOUNT COUNTY, US 129/ SR 115 Tail of the Dragon: Due to the one lane condition of Interstate 40 near the Tennessee and North Carolina State Line as repairs continue from Hurricane Helene, this is a reminder for commercial vehicles in Tennessee and North Carolina attempting to use US 129 as an alternate around the I-40 work zone. No trucks with trailers over 30 feet in length, or single units over 30 feet in length are permitted on US 129 “The Dragon” in Tennessee or North Carolina. Thru truck traffic in Tennessee should take I-81 North to Virginia and then take I-77 South into North Carolina. These restrictions of US 129 will be strictly enforced day and night.

 

BRADLEY COUNTY I-75 [15.35-19.309] from MM 31 to MM 35 (McMinn County Line) resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNY261]

 

BRADLEY COUNTY SR-40 [5.1-9.7] from Lyles Rd. to Bradley-Polk County Line resurfacing: During this reporting period, the contractor will continue resurfacing work on SR-40. Temporary lane closures will be necessary during daytime hours on weekdays while work is performed. Motorists should use caution when traveling through the work zone and be aware of equipment in the area. [APAC – Atlantic, Inc./Cleveland/CNZ020]

 

BRADLEY COUNTY SR-60 [13.1-13.28] at Benton Pike safety improvements: During this reporting period, improvements on the SR60 North exit to Benton Pike will continue. Expect the roadway to be reduced to one lane weekdays between the hours of 8:00 AM – 3:30 PM. The SR-60 North exit ramp to Benton Pike will be closed for the duration of the project. A signed detour is in place. [Wright Brothers Construction Company, Inc./Cleveland/CNZ183]

 

BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will perform punch list work on SR-60 in Bradley County. Intermittent lane closures may be necessary while work occurs. [Summers-Taylor, Inc./Cleveland/CNV130]

 

CAMPBELL COUNTY, I-75 North and South between Mile Markers 156 and 161: Motorists should be alert for possible lane closures through this project. Motorists should expect potential delays, be alert for slow or stopped traffic, and use extreme caution through this area.

 

CAMPBELL COUNTY, SR 63 between SR 297 and Stinking Creek Road: Motorists should be alert for possible temporary lane closures through this construction project. Motorists should be alert for slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

CAMPBELL, COFFEE, DAVIDSON, DICKSON, GILES, GREENE, HAYWOOD, KNOX, MCMINN, SHELBY, AND WILLIAMSON COUNTY. The installation of Weigh-in-Motion technology at 28 sites on various Interstate and State Routes: No Region 2 Lane Closures this week on CNX913. [Davis H. Elliot Construction Company, Inc./Maint – R2/CNX913]

 

CANNON COUNTY SR-281 [0-4.51] from SR-53 to Todd Rd resurfacing: The contractor will have lane closures during daylight hours from 5 AM to 9 PM for operations involving installing traffic control devices and then milling and paving operations as needed. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times. [Rogers Group, Inc./McMinnville/CNZ066]

 

CARTER COUNTY, US 19E/ SR 37 between Log Miles 0 and 8: Motorists should be alert for possible temporary lane closures between the hours of 8:30 a.m. and 7 p.m. through this resurfacing project. Motorists should be alert for slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

CARTER COUNTY, US 321/SR 159 between Green Hollow Road and Poga Road: This section of US 321/ SR 159 is closed due to damages sustained during recent storm events. Motorists should seek alternate routes around this area. For current road conditions, go https://smartway.tn.gov/

 

CLAIBORNE COUNTY, SR 33 between Log Miles 13.1 and 22.7: Motorists should be alert for possible temporary lane closures between the hours of 7 a.m. and 6 p.m. through this resurfacing project. Motorists should be alert for slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

COCKE COUNTY, I-40 East between Mile Marker 446 and North Carolina State Line: I-40 East is reduced to 1 lane between Mile Marker 446 in Tennessee and Mile Marker 7 in North Carolina due to damages sustained during Hurricane Helene. Traffic wider than 8 ½ feet is prohibited through this area. Wide Loads should follow I-81 North to I-77 South. This area remains a heavily active construction zone as permanent repairs continue. Motorists should be alert for workers and construction equipment entering and exiting the roadway in this work zone. Motorists should be alert that there are areas with no shoulders and no emergency pull off locations through this work zone. There are no services in this area. Motorists should ensure they have plenty of fuel and vehicle is in good mechanical condition traveling through this area. Motorists should expect potential long delays. Motorists should be prepared to stop and be alert for slow or stopped traffic. Motorists should use extreme caution and avoid all distractions traveling through this area. I-40 “Thru Traffic” should continue to follow I-81 North to I-26 East or I-77 South to avoid potential major delays. For current road conditions, go https://smartway.tn.gov/

 

COCKE COUNTY, SR 35 between Old Newport Highway and Fain Road: Motorists should be alert for possible temporary lane closures between the hours of 6 a.m. and 6 p.m. through this construction project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

COCKE COUNTY, US 25/70 between Tennessee State Line and Hot Springs, North Carolina: Thru truck traffic is prohibited on US 25/70 in North Carolina between the Tennessee State Line and Hot Springs, North Carolina. Truck traffic to North Carolina should follow I-81 North to I-26 East or I-77 South. Traffic wider than 10 feet is prohibited on I-26 between Mile Markers 37 and 40.

 

COFFEE COUNTY I-24 (MM 105) construction of an overpass carrying SR-2 (US-41): Periodic flagging operations will be utilized daily for remaining construction activities. [Bell and Associates Construction, LP/Tullahoma/CNX309]

 

COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone. [Jones Bros. Contractors, LLC/Tullahoma/CNZ029]

 

COFFEE COUNTY I-24 resurfacing from east of SR-2 (US-41) (LM 8.9) to near SR-55 (LM 14.8), including bridge expansion joint repairs and thin epoxy overlay: Nightly alternating lane closures will continue on I-24 from 7 PM-6 AM for resurfacing operations. One lane in each direction will be maintained at all times. [Rogers Group, Inc./Tullahoma/CNY262]

 

COFFEE COUNTY I-24 TDOT Bridge Maintenance eastbound at MM 113.8: TDOT Bridge Repair operations will be performed on 10/08/2025 between 8 PM and 2 AM on 10/09/2025. This work will consist of a lane closure in lane 2 at MM 113.8 on I-24 EB. Traffic control and THP will be in place, and motorists are asked to use caution in this area.

 

COFFEE COUNTY I-24 TDOT Contractor, both directions from MM 110.9 to MM 111.5: From 9 AM-3 PM, on 10/02/25-10/08/25, the surveyor will have a mobile operation on the shoulder of I-24 from MM 110.94-MM 111.54 as they set control points for an upcoming project. There will be a crash truck behind the workers on the shoulder.

 

COFFEE COUNTY SR-53 (WOODBURY HWY.) Utility Work both directions at LM 3.60: Flagger assisted lane closures on SR-53 (Woodbury Hwy) at Maple Spring Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 10/1/25 with a rain date of 10/2/25 from 9 am – 10 am. [2025-431]

 

COFFEE COUNTY SR-55 (MCMINNVILLE HWY.) TDOT Contractor both directions from LM 14.1 to LM 14.7: From 9 AM-3 PM, on 10/02/25-10/08/25, the surveyor will have a mobile operation on the shoulder of SR55 from Interstate Drive to Old Bushy Branch Road (LM14.581-LM15.315) as they set control points for an upcoming project. There will be a crash truck behind the workers on the shoulder.

 

COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 1 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. Contractor may use temporary lane shifts to complete storm structure installations. Phase 1 traffic shift has reduced lanes from 3 to 2 from Cedar Lane to near Grau Lane in order to continue bridge replacement and storm drainage work. There will be a right lane closure on US-41A (N Jackson Street) starting Monday, 10/06 at 8 AM through Monday 10/13 at 6 AM for storm drainage installation. [Dement Construction Company, LLC/Tullahoma/CNX912]

 

COFFEE COUNTY SR-55 repair of the bridge over the Little Duck River (LM 14.0): Lanes are reduced to one lane in each direction across the SR-55 bridge over the Little Duck River for bridge repair work. This lane reduction will be in place until work is complete in Fall 2025. [Mid-State Construction Company, Inc./Tullahoma/CNX412]

 

CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): The contractor has shifted traffic to phase 2 on the newly constructed portions of SR-28 LM 0.90 to 1.98 in Fentress County. Work will proceed on the existing alignment of SR-28. Flaggers are being used intermittently as needed to control traffic through the work zone. Motorists are encouraged to use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel throughout the project. [Jones Bros. Contractors, LLC/Cookeville/CNV300]

 

CUMBERLAND COUNTY I-40 [304-306] from Putnam County Line to near parking area resurfacing and bridge repair: The contractor will be performing shoulder work and pavement marking installations nightly on I-40 from MM 304 to MM 307 from 7 PM to 6 AM. During this work, one lane in each direction will be closed. Motorists should use caution as they approach the work zone and should prepare to encounter slow or stopped traffic. [Rogers Group, Inc./Cookeville/CNZ104]

 

CUMBERLAND COUNTY I-40 [317.86-322.37] from near Obed River to near SR-101 resurfacing: The contractor is performing nighttime resurfacing operations of I-40 from near the Obed River at MM317.8 to near SR-101 at MM322.3. This work will typically take place between Sunday night through Friday morning from 7PM to 6AM each night. Motorists should use caution when traveling through the area. [Rogers Group, Inc./Crossville/CNY241]

 

CUMBERLAND COUNTY SR-1 (US-70 E.) Utility Work eastbound from LM 23.91 to LM 24.02: Flagger assisted lane closures on SR-1 (US 70) between Cox Valley RD and Chestnut Hill Rd. Motorists should reduce speed and be prepared to stop. Trucks, advanced warning signs, flaggers, and barrels/cones will be present 09/25/25 thru 10/8/25 from 9 am – 2 pm. [2025-539]

 

CUMBERLAND COUNTY SR-1 (US-70) construction of bridge over the Obed River (LM 12.7): Construction activities may take place on SR-1 (US-70) over the Obed River bridge. Construction crews will be working outside of the roadway to complete remaining work activities. Traffic should be cautious of construction equipment near the shoulders. The contractor may need to flag traffic to move equipment or vehicles across the road. [Whaley Construction, LLC/Crossville/CNX110]

 

CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. The contractor has scheduled paving operations beginning on the north end of the project on the proposed alignment. The contractor has closed North Grace Hill Drive at the existing intersection of SR-28 (US-127) for construction activities. Motorists should utilize South Grace Hill Drive as the detour with appropriate signs. Traffic has been moved to temporary alignment on Plateau Road and permanent alignment on Potato Farm Road. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]

 

CUMBERLAND COUNTY SR-298 [8.35-9.02] from north of Catoosa Canyon Dr to south of Obed Pines Rd construction of a small drainage structure: The contractor continues construction activities on Genesis Road (SR-298). Both lanes of Genesis Road (SR-298) at LM 8.35 to LM 9.02 have been closed and will be closed for the duration of the project, with a posted detour route along SR-28 (US-127) and SR-62. The contractor will be working to replace a culvert underneath Genesis Road and installing retaining walls. RESTRICTIONS: Both lanes of Genesis Road (SR-298) are closed from LM 8.35 to LM 9.02. [J. Hill Excavating, LLC/Crossville/CNZ103]

 

CUMBERLAND COUNTY SR-462 from SR-28 (US-127N / LM 3.1) to SR-298 (Genesis Road / LM 4.6) in Crossville: Construction may take place as contractor finishes the remaining small items. Activities may require temporary lane closures and/or traffic stoppages on Interstate Drive (SR-462), as well as short term closures of city streets. Flagging operations will accompany these closures with appropriate signs. Motorists should use caution when traveling through the work zone. [Rogers Group, Inc./Crossville/CNV010]

 

CUMBERLAND COUNTY SR-68 [0.34-5.58] from near SR-28 (US-127) to near Wiley Ford Road resurfacing: The contractor will be performing paving activities along SR-68 from near SR-28 (LM 0.34) to near Wiley Ford Road (LM 5.58). During these operations, a temporary lane closure will be utilized with flaggers and signs. Motorists should use caution when traveling through the project limits. [Rogers Group, Inc./Crossville/CNZ135]

 

DEKALB COUNTY SR-26 (W. BROAD ST.) Utility Work eastbound at LM 17.01: Eastbound outside-right lane shoulder closure on SR 26 (W Broad St.) at the intersection of Whaley St. and W Broad St between Carter St. and Dry Creek Rd. Message boards, signage, and utility strobe vehicles will be present. Motorists should be aware of personnel and equipment, reduce speed, and be prepared to stop. 09/22/25 between 9:00 am and 2:00 pm through 09/30/2025 between 9:00 am to 2:00 pm [2023-710]

 

DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor continues grading and construction activities throughout the project. Temporary lane closures and periodic traffic stoppages will be necessary for construction activities. Motorists should be prepared to stop while traveling through the work zone. Motorists are encouraged to obey the posted speed limit and to watch for construction equipment and personnel adjacent to the roadway. The West end of Old Liberty Road will be closed to through traffic due to construction activities. Motorists and EMS will need to use the East entrance of Old Liberty Road to gain access and follow detour signs. [Twin K Construction/Cookeville/CNV012]

 

DEKALB COUNTY SR-26 [10.88-13.25] from Near East Main Street to Trapp Lane resurfacing: The contractor is scheduled to remove snow-plowable markers on 10/01/2025 and milling operation on 10/06/2025. During this work, temporary lane closures will be used, and motorists are expected to follow all signage and expect delays. Motorists should use caution will traveling through the work zone. [Tinsley Asphalt, LLC /Cookeville/CNZ136]

 

GRAINGER COUNTY, SR 131 between Log Miles 7 and 8: Motorists should be alert for lane closures through this construction project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

GRAINGER COUNTY, US 11W/ SR 1 between Broadway Drive and Huntsman Lane: Motorists should be alert for possible lane closures between the hours of 9 a.m. and 3 p.m. through this resurfacing project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

GREENE COUNTY, SR 70 between Log Miles 27 and 31.9: Motorists should be alert for possible temporary lane closures through this resurfacing project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

GREENE COUNTY, US 11E /SR 34 Bridge over Snapps Ferry Road: Motorists should be alert for lane closures in place around the clock through this bridge repair project. Motorists should be alert for possible lane closures at various times on Snapps Ferry Road as crews perform work underneath the bridge. Motorists should be alert for workers present, expect delays, and use extreme caution through this area.

 

GREENE COUNTY, US 321/SR 35 between US 11E and Ricker Avenue: Motorists should be alert for possible temporary lane closures through this resurfacing project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

GRUNDY COUNTY SR-56 [5.42-7.81] from Montgomery Street to Des Church Road resurfacing: The contractor will have lane closures as needed during daylight hours between 5 AM to 9 PM only as needed for punch list-related operations. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times. [Tinsley Asphalt, LLC /McMinnville/CNZ033]

 

HAMBLEN COUNTY, US 11E/ SR 34 near Commerce Blvd.: Through Friday, October 10, 2025, motorists should be alert for possible temporary lane closures daily between the hours of 9 a.m. and 3 p.m. as crews perform turn lane construction. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

HAMBLEN COUNTY, US 11E/ SR 34 near Depot Street and Jay Bird Road: Motorists should be alert for temporary lane closures and brief stoppages by flagging personnel at various times through this construction project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

HAMILTON COUNTY I-124 (US-27) from I-24 Interchange to South of the Tennessee River Bridge: Daily lane closures are possible between 9 AM and 3:30 PM as the contractor works along the ramps and 4th Street. Motorists are advised to reduce speed in the work zone and watch for flaggers assisting with traffic control. [Stansell Electric Company, Inc./Chattanooga East/CNY900]

 

HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly Lane closures will occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. These closures may temporarily reduce traffic to a single lane. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. (Note: Nighttime Lane closures (9 PM to 6 AM) of I-24 West and East should be expected between Germantown Road and Spring Creek Road from Sunday (10/5) to Thursday (10/9) for paving as well as painting and texture coating of retaining and noise walls. At times, traffic may be temporarily reduced to a single lane while this work is taking place. The contractor will be closing lanes on I-75 North and South nightly (9 PM to 6 AM) in the East Brainerd Road (Exit 3) area from Sunday, October 5th, through Thursday, October 9th, for installation of additional overhead signs. The contractor is planning to set beams during the day at the railroad bridge near East Brainerd Road from Monday, October 6th through Thursday, October 9th. While no lane closures are anticipated for this work, heavy equipment will be operating close to traffic and large trucks will be entering and exiting the median in this area. Motorists should stay alert to possible changing traffic conditions during this time and follow the speed limit.) It may also be necessary to do short-duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or repairing guardrail, attenuators, etc. Portions of the left lane on North and South Terrace between Germantown Road and Spring Creek Road will remain closed for the installation of drainage structures, sanitary sewers, retaining and noise wall construction. [Wright Brothers Construction Company, Inc./Maj Prj – Blevins/DB2101]

 

HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, Shallowford Road exit ramps, and Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman’s Jewelers and Texas Roadhouse. The contractor has implemented a traffic shift on Hamilton Place Blvd., shifting NB and SB traffic to the east side of the existing roadway from near the I-75 SB on-ramp to near Bams Drive for the installation of storm drainage. The contractor will maintain 1 lane of traffic in each direction throughout this area. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted from 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]

 

HAMILTON COUNTY I-75 [4.2-4.5] from Exit 4A to SR-153 to Exit 3 to East Brainerd Road box culvert rehabilitation: The right shoulder of SB I-75 is closed with concrete barrier rail in place. Drivers should watch for construction vehicles entering and exiting the interstate. 02/25 Two SB lanes will be closed on Thursday Night, 10/02/25, between the hours of 8 PM and 6 AM. [Wright Brothers Construction Company, Inc./Chattanooga East/CNZ186]

 

HAMILTON COUNTY SR-153 (STATE HWY. 153) Utility Work southbound from LM 11.36 to LM 11.57: Flagging assisted lane closures on SR 153 (Hwy 153) between Grubb Rd and Stone Ridge Rd near Academy and Kohl’s. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 10/7/25, with a rain date of 10/10/25, from 9:00 am to 1:00 pm [2025-638]

 

HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 0.0 to LM .74: Flagging assisted lane closures on Lee Hwy (OE479) from near the entryway for McKay’s to the end of Lee Hwy at General shale Brick & Building Materials. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 09/08/25 through 11/10/25 from 7 am – 5 pm/ [2024-297]

 

HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 18.80 to LM 18.86: Flagger assisted lane closures on SR-2 (Lee Hwy) between McCutcheon Rd and Elm Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 10/2/25 through 10/3/25 from 9 am – 2 pm. [2024-338]

 

HAMILTON COUNTY SR-2 [11.33-11.92] from Dodds Ave to Seminole Drive tunnel rehabilitation: There will be nighttime flagging operations to allow the contractor to finish final pavement striping. The flagging operations will be between the hours of 8 PM and 6 AM. [Stansell Electric Company, Inc./Chattanooga East/CNY192]

 

HAMILTON COUNTY SR-2 [2.73-3.19] from Wauhatchie United Methodist Church to Brown’s Ferry safety improvements: The contractor will be working between the hours of 8 pm and 6 am to finish up roadway striping. [APAC – Atlantic, Inc./Chattanooga East/CNZ107]

 

HAMILTON COUNTY SR-29 [20.72-25.756] from SR-111 to Old Dayton Pk. Resurfacing: The contractor will continue resurfacing operations. This work will require temporary lane closures on US-27 during the day, 7 AM to 7 PM. Additional night work is planned this reporting period, requiring lane closures through 10/02/2025. [Rogers Group, Inc./Chattanooga West/CNZ034]

 

HAMILTON COUNTY SR-8 (W. MAIN ST.) Utility Work both directions from LM 8.02 to LM 8.21: Flagger-assisted lane closure on SR 8 (W Main St) between Williams St and Mitchell Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present, 10/3/25 (with a rain date of 10/10/25 from 9 am – 2 pm. [2025-108]

 

HAMILTON COUNTY SR-8 [10.14-11.96] from Frazier Ave to Signal Mountain Blvd resurfacing: The contractor will be performing night work between the hours of 8 pm and 6 am to finish roadway striping. [APAC – Atlantic, Inc./Chattanooga East/CNZ138]

 

HAMILTON COUNTY SR-8 [8.97-10.14] from MLK to Frazier Avenue resurfacing: Contract crews will be working on Market Street intersections overnight from Sunday through Friday, between 8:00 PM and 6:00 AM local time, to minimize daytime traffic impacts. There will be limited designated on-street parking during this work. This designation enables crews to work around intersections and not trap vehicles within required lane closures. Drivers should obey the posted no-parking signs. Violators are subject to tickets and/or towing. Drivers should expect lane closures and short detours around city blocks during overnight hours. The intersection portion of the project is expected to start Sunday, September 22nd, weather permitting. [APAC – Atlantic, Inc./Chattanooga East/CNZ107]

 

JACKSON COUNTY SR-135 [15.74-20.76] from SR-56 to Clay County Line resurfacing: The contractor is scheduled to start paving operations on 10/01/2025. During this work, temporary lane closures will be used with flaggers present. Signs warning of the closures will be in place. Motorists should use caution as they approach the work zone and should prepare to stop and follow the directions of the flagger. [Rogers Group, Inc./Cookeville/CNZ139]

 

JEFFERSON COUNTY, SR 363 between SR 92 and SR 9: Motorists should be alert for possible temporary lane closures daily through this resurfacing project. Motorists should be alert for workers present, slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

JEFFERSON COUNTY, US 11E/SR 34 at North Chucky Pike: Motorists should be alert for possible lane closures daily between the hours of 9 a.m. and 3 p.m. as crews perform work through this intersection improvement project. Motorists should be alert for workers present and use extreme caution through this area.

 

JEFFERSON COUNTY, US 25/70/SR 9 over Rimmer Creek (L.M. 13.2) and Koontz Creek (L.M. 14.2): Motorists should be alert for workers present, possible lane closures at various times, and use extreme caution through this construction project.

 

JOHNSON COUNTY, SR 34 between Log Miles 17.3 and 21.1: Motorists should be alert for possible temporary lane closures daily through this resurfacing project. Motorists should be alert for workers present, slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

JOHNSON COUNTY, SR 91 between Log Miles 10.2 and 14.3: Motorists should be alert for possible temporary lane closures daily through this resurfacing project. Motorists should be alert for workers present, slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

 

JOHNSON COUNTY, US 321/SR 159 between Carter County Line and North Carolina State Line: This section of US 321/ SR 159 is closed due to damages sustained during recent storm events. Motorists should seek alternate routes around this area. For current road conditions, go https://smartway.tn.gov/

 

KNOX COUNTY, I-275 North and South between I-40 and I-640: Motorists should be alert for possible nightly lane closures between the hours of 7 p.m. and 6 a.m. the following morning as crews perform final roadway and bridge work activities. Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution through this area.

 

KNOX COUNTY, I-40 East near Mile Marker 393.5: On Sunday, October 5, 2025, and Monday, October 6, 2025, motorists should be alert for possible temporary lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform roadway maintenance activities. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

KNOX COUNTY, I-75 between Mile Markers 111 and 112: On Monday, October 6, 2025, through Wednesday, October 8, 2025, motorists should be alert for possible temporary lane closures between the hours of 7 p.m. and 6 a.m. the following morning as crews perform sign installations. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

KNOX COUNTY, US 11/SR 1 near Watt Road: Through Friday, October 10, 2025, motorists should be alert for possible temporary lane closures between the hours of 9 a.m. and 3 p.m. as crews perform roadway construction activities. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

KNOX COUNTY, US 129/SR 115 Alcoa Highway between SR 168 John Sevier Hwy. and Cherokee Trail: Beginning at 12:01 a.m. on Saturday, October 4, 2025, all lanes on northbound Alcoa Highway (US 129/SR 115) will be closed between John Sevier Highway (SR 168) and the UT Medical Center. This closure is necessary to allow the contractor to blast, scale, and remove rock outcroppings on the adjacent slope of the roadway. Motorists traveling from Blount County and McGhee-Tyson Airport are encouraged to detour utilizing I-140 (Pellissippi Parkway) to bypass the work zone. Local traffic may utilize the alternate route onto State Route 168 (John Sevier Highway) to US 441 (Chapman Highway). Maloney Road Interchange will remain open for local traffic access only. Southbound traffic is anticipated to remain largely unaffected. Rolling roadblocks in the southbound direction will be utilized during the blast and used intermittently throughout the remainder of the weekend to escort emergency services to the University of Tennessee Medical Center. This closure is anticipated to be complete by 6:00 a.m. on Tuesday, October 7, 2025. This schedule is contingent on favorable weather conditions. If inclement weather occurs, this work will be rescheduled to the weekend of October 18, 2025. Motorists are advised to expect delays and use extreme caution in this area as workers will be present.

 

KNOX COUNTY, US 129/SR 115 Alcoa Highway between Topside Road and Maloney Road: Motorists should be alert for possible temporary lane closures, lane shifts, and new traffic patterns as crews perform work through this project. Motorists are advised to use extreme caution as workers will be present.

 

KNOX COUNTY, US 129/SR 115 Alcoa Highway between Woodson Drive and Cherokee Trail: Motorists should be alert for possible temporary nightly lane closures from 7 p.m. to 6 a.m. the following morning as crews perform roadway construction between Woodson Drive and Cherokee Trail. Motorists should be alert for crews intermittently pacing traffic between Woodson Drive and Cherokee Trail on Alcoa Highway (US 129/State Route 115) daily, as needed, to move equipment and materials within the project limits and to conduct routine roadway maintenance. Disruptions to traffic flow are anticipated to be short in nature. Motorists should be alert for workers present, reduce speed, be alert for slow or stopped traffic, and use extreme caution through this construction project.

 

KNOX COUNTY, US 25/ SR 9 Clinton Highway between Schaad Road and Anderson County Line: Motorists should be alert for possible lane closures nightly between the hours of 7 p.m. and 6 a.m. the following morning through this resurfacing project. Motorists should be alert for workers present, possible slow traffic, and use extreme caution through this area.

 

KNOX COUNTY, US 441/ SR 71 between Simpson Road and Hendron Chapel Road: Motorists should be alert for possible lane closures, workers present, changed conditions, expect potential delays, and use extreme caution through this construction project.

 

KNOX COUNTY, Various Interstates through Knoxville: Motorists should be alert for possible mobile lane closures nightly between the hours of 8 p.m. and 6 a.m. the following morning as crews perform roadway maintenance activities. Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution in this area.

 

LOUDON COUNTY, I-40 East and West between Mile Markers 363 and 369: Motorists should be alert for possible temporary lane closures nightly between the hours of 7 p.m. and 6 a.m. the following morning as crews perform work through this resurfacing project. Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution through this area.

 

LOUDON COUNTY, I-40 East and West near Mile Marker 363: Beginning at 7p.m. Friday, October 3, 2025, through 6 a.m. Monday, October 6, 2025, I-40 East and West will be reduced to one lane around the clock as crews perform bridge repairs. Motorists should be alert for workers present, slow or stopped traffic, expect potential long delays, and use extreme caution through this area.

 

LOUDON COUNTY, SR 72 between Monroe County Line and Good Hollow Road: Motorists should be alert for possible lane closures daily between the hours of 9 a.m. and 3:30 p.m. through this resurfacing project. Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution through this area.

 

MARION COUNTY I-24 [156.4-160.2] from 156.4 to 160.2 resurfacing: The contractor will be performing resurfacing operations on I-24 EB and WB in Marion County from MM 156.4 East of SR-28 to MM 160.2 West of the Tennessee River. This work will require single lane closures, leaving one lane open in each direction each night worked. Resurfacing operations will be Sunday through Thursday from 6 PM CT – 5 AM CT. Please use caution when driving through the work zones. [Talley Construction Company, Inc./Dunlap/CNZ108]

 

MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will be performing slide mitigation operations, including grading, drainage and paving on SR-108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone. [Wright Brothers Construction Company, Inc./Dunlap/CNZ226]

 

MARION COUNTY SR-156 repair of bridge over Tennessee River, LM 15.2: The contractor will be performing painting operations and structural repairs on the SR-156 bridge over the Tennessee River in South Pittsburg. This work will require intermittent lane closures controlled by flaggers or a temporary traffic signal, leaving one lane open. Please use caution when driving through the work zone. [Olympus Painting Contractors Inc./Dunlap/CNY063]

 

MARION COUNTY SR-2 (16.90 to 17.5) Utility Work: The right shoulder of SR2 between Shellmound Road (log mile 16.90) and Spangler Road (log mile 17.5) will be closed for Utility Work for the Project to lengthen the box culvert. Shoulder closures: Monday, 6th through Friday the 10th of October.

 

MARION COUNTY SR-2 [17.2-17.3] from 17.2 to 17.3 construction: The contractor will be performing grading and drainage operations on SR-2 in Marion County near LM 17.25. This work will require a lane shift for the EB traffic; the WB traffic will be unaffected. Please slow down and use caution when driving through the work zone. [Talley Construction Company, Inc./Dunlap/CNZ244]

 

MARION COUNTY SR-27 (US-72) resurfacing from the Alabama State Line (LM 0) to north of SR-156 (LM 2.7): The contractor will be performing paving operations on SR-27 EB and WB in Marion County from the Alabama state line to north of SR-156. This work will require single lane closures, leaving one lane open in each direction during daytime work hours. Please use caution when driving through the work zones. [Tinsley Asphalt, LLC /Dunlap/CNZ036]

 

MARION COUNTY SR-28 (STATE HWY. 28) TDOT Maintenance southbound from LM 1.2 to LM 1.8: TDOT maintenance will begin work on building a turning lane on SR-28 between LM 1.2 and 1.8 on 10/28/2025. This operation will continue until 11/05/2025, with traffic control set up to shift traffic through the work zone. Northbound traffic will not be affected. Motorists are asked to use caution in this area.

 

MCMINN COUNTY I-75 [0-2.06] from MM 35 (Bradley County Line) to MM 37 resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights, 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNY261]

 

MCMINN COUNTY I-75 [2.06-4.32] from MM 37 to MM 39.5 resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNZ109]

 

MCMINN COUNTY SR-39 construction of a bridge over Middle Creek (LM 13.4): During this reporting period, the Northbound and Southbound traffic will be reduced to one lane and controlled by traffic signals. County Road 567 will be closed to traffic (LOCAL TRAFFIC ONLY) and detoured to SR039. This closure is necessary to perform the bridge replacement. The lane restriction will remain in place until the bridge replacement is completed. [Whaley Construction, LLC/Chattanooga East/CNX069]

 

MCMINN COUNTY SR-39 from west of Cook Drive to SR-30 and from SR-310 to the Monroe County Line: During this reporting period, the contractor will complete punch list work on SR-39. Motorists should be aware of workers in the area performing this work. Intermittent lane closures and flagging operations around the work area will be necessary. [Rogers Group, Inc./Cleveland/CNZ038]

 

MONROE COUNTY, I-75 North and South at Exit 62: Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution through this bridge construction project.

 

MONROE COUNTY, SR 322 Oakland Road at I-75: Motorists should be alert for possible lane closures with flag persons directing traffic as crews perform bridge work in this area. Motorists should be alert for workers present and use extreme caution in this area.

 

POLK COUNTY SR-68 construction of bridge over Brush Creek (LM 16.4): During this update period, the contractor will continue punch list work on SR-68 in Polk County. Intermittent lane closures may be necessary to complete this work. [Wright Brothers Construction Company, Inc./Cleveland/CNX347]

 

POLK COUNTY SR-68 over SR-40. The construction of bridges: During this reporting period, the contractor will continue construction on the SR-68 North bridge. All SR-68 traffic is using the existing SR-68 South bridge while construction occurs on the new SR-68 North bridge. All SR-40/SR-68 interchange traffic will utilize the SR-68 South interchange ramps. A temporary 3-way stop has been implemented at the intersection of the SR-40 interchange ramp and SR-68. Motorists are encouraged to slow down when entering the construction zone and look out for new stop signs on SR-68 near the SR-40/SR-68 interchange. [Wright Brothers Construction Company, Inc./Cleveland/CNZ042]

 

PUTNAM COUNTY I-40 [300-304] from West of SR-24 to Cumberland County Line resurfacing and bridge repair: The contractor will be performing shoulder work and pavement marking installations nightly on I-40 from MM 300 to MM 304 from 7 PM to 6 AM. During this work, one lane in each direction will be closed. In addition, the on and off ramps may be closed intermittently to allow the contractor to work on the ramps. Signs and message boards warning of the closures will be in place. Motorists should use caution as they approach the work zone and should prepare to encounter slow or stopped traffic. [Rogers Group, Inc./Cookeville/CNZ104]

 

PUTNAM COUNTY SR-136 (S. JEFFERSON AVE.) Utility Work both directions from LM 2.55 to LM 2.75: Northbound and southbound lane closures on SR-136 (S Jefferson Ave) between Spring Street Town Square to I-40. Motorists should reduce speed and be prepared to stop. Arrow boards/message boards, flaggers, and barrels/cones will be present, 11/14/24 through 11/04/25, from 9 am – 2 pm. [2024-640]

 

PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor continues grading activities throughout the project. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. Bunker Hill Rd is closed at the intersection of SR-136 with detour signs to utilize Henley Dr. Motorists are encouraged to use caution while traveling through the work zone and be aware of construction personnel and equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/CNV284]

 

PUTNAM COUNTY SR-84 (CALFKILLER HWY.) Utility Work both directions from LM 1.0 to LM 8.0: Flagger-assisted lane closures on SR-84 (Calfkiller Hwy) from the White County line to Hidden Acres Road. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present, 04/24/25 through 11/30/25 from 8 am – 3 pm. [2023-577]

 

RHEA COUNTY SR-29 [14.66-19.879] from Boofer Lane to Metzger LN Resurfacing: Paving is complete. The contractor will continue will clean up and finish markings. This work may require temporary lane closures from 7AM to 6PM or mobile operations. Motorists should use caution while traveling on this route and pay attention to all construction signage. [Rogers Group, Inc./Chattanooga West/CNY118]

 

SULLIVAN COUNTY, I-26 West near Mile Marker 8.7: On Tuesday, October 7, 2025, motorists should be alert for possible temporary lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

SULLIVAN COUNTY, I-81 North and South between Mile Markers 54 and 58: Motorists should be alert for possible lane closures nightly between the hours of 7 p.m. and 6 a.m. the following morning through this resurfacing project. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

SULLIVAN COUNTY, I-81 North between Mile Markers 57 and 75: On Monday, October 6, 2025, and Tuesday, October 7, 2025, motorists should be alert for possible temporary lane closures between the hours of 7 a.m. and 7 p.m. as crews perform roadway maintenance activities. Motorists should be alert for workers present, slow or stopped traffic, expect possible delays, and use extreme caution through this area.

 

SULLIVAN COUNTY, I-81 North near Mile Marker 69.4: On Tuesday, October 7, 2025, motorists should be alert for possible temporary lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

SULLIVAN COUNTY, SR 93 at Bloomingdale Road: Motorists should be alert for possible lane closures at various times through this signal upgrade project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

 

SULLIVAN COUNTY, SR 93 between Murrell Road and SR 347: Motorists should be alert for possible lane closures through this project. Motorists should expect potential delays, be alert for slow or stopped traffic, and use extreme caution through this area.

 

UNICOI COUNTY, I-26 East near Mile Marker 41.1: On Wednesday, October 8, 2025, motorists should be alert for possible temporary lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

UNION COUNTY, SR 33 between Knox County Line and SR 144: Motorists should be alert for new lane shifts through this project. Motorists should be alert for possible lane closures at various times through this construction widening project. Motorists should be alert for new traffic patterns, lane shifts, workers present and use caution through this area.

 

WARREN COUNTY SR-108 [2.83-11.49] from near S.R. 287 to South Chancery Street micro-surfacing and bridge expansion joint repair: The contractor will have lane closures as needed during daylight hours between 5AM to 9PM only as needed for punch list related operations. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times. [Wiregrass Construction Company, Inc./McMinnville/CNZ043]

 

WASHINGTON COUNTY, I-26 East near Mile Marker 23.5: On Tuesday, October 7, 2025, motorists should be alert for possible temporary lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

 

WASHINGTON COUNTY, SR 353 Bridge over the Nolichucky River: The SR 353 Bridge over the Nolichucky River is closed due to damages sustained during recent storm events. Motorists should seek alternate routes around this area. For current road conditions, go https://smartway.tn.gov/

 

WASHINGTON COUNTY, SR 354 between SR 34 and Christian Church Road: Motorists should be alert for possible temporary lane closures nightly between the hours of 7 p.m. and 6 a.m. the following morning through this resurfacing project. Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution through this area.

 

REGION 2 Dynamic Message Sign (DMS) Life Cycle Replacement: Daily outside shoulder closures will take place on Bradley I-75 NB between MM 27 and MM 34 and McMinn I-75 SB at MM 45 and MM 35, and Marion County I-24 WB at MM 156. Trucks will be entering and exiting the work zone during daytime hours. No lane closures this week. [Davis H. Elliot Construction Company, Inc./Chattanooga East/CNX413]

 

REGION 2 preventative and unscheduled maintenance of Chattanooga SmartWay Intelligent Transportation System: The contractor may have short-term shoulder and/or lane closures to perform preventative or unscheduled maintenance to the local SmartWay Intelligent Transportation System. At least one travel lane will always remain open to traffic. [Lumin8 Transportation Technologies, LLC/Chattanooga East/CNX270]

 

REGION 2 Retracing of painted pavement markings: The contractor is expected to start paint retracing in the following counties: Bradley SR-60 from LM 3.850 – 8.200, Franklin SR-15 from LM 22.210 – 27.200, Marion SR-283 from LM 0.000 – 2.600. During this work, the contractor will be utilizing a mobile operation with attenuators. Motorists should be aware of wet paint when crews are present and expect delays. [Reynolds Sealing and Striping, Inc./Cookeville/CNZ052]

 

REGION 2 Snow-plowable marker re-lensing: The contractor will start snow-plowable lens replacement on 09/15/2025 on the following routes: Picket County SR-28 from LM 1.590 – 7.140, SR-52 from LM 0.000 – 2.260, SR-111 from LM 0.000 – 12.055, SR-154 from LM 0.000 – 5.726, SR-295 from LM 0.000 – 5.030, and SR-325 from LM 0.000 – 12.625, and Fentress County SR-28 from LM 0.000 – 33.580, SR-52 from LM 4.420 – 13.600, SR-52 from LM 17.620 – 27.930, SR-62 from LM 0.000 – 12.710, SR-85 from LM 0.000 – 11.010, SR-154 from LM 0.000 – 13.480, SR-296 from LM 0.000 – 3.030, SR-297 from LM 0.000 – 8.790, and SR-325 from LM 0.000 – 2.540. The contractor is expected to perform this work in the evening (8 PM – 6 AM) and will be utilizing a mobile operation. Motorists should use caution and expect delays when contractor crews are present. [W.L. Markers Inc./Cookeville/CNZ053]

 

REGION 2 The crack sealing at various locations on various State Routes: The contractor will have lane closures between 5 AM and 9 PM for crack sealing operations. Work will continue 7 days per week unless the contractor stops for weather or other logistical purposes. Locations: Hamilton County SR-317 LM 5.14 to 7.70, Marion County SR-2 LM 1.40 to 11.55, Bledsoe County SR-30 LM 0.0 to 10.40, Cumberland County SR-28 LM 14.96 to 8.25, Overton County SR-111 LM 3.29 to 10.69, Clay County SR-82 LM 20.58 to 26.60, Putnam County SR-111 LM 0.00 to 2.03, White County SR-111 LM 13.52 to 18.72, Cannon County SR-145 LM 0.0 to 9.67 and SR-281 LM 4.51 to 6.07, Warren County SR-287 LM 10.00 to 14.32 and SR-56 LM 15.43 to 24.88 [Reynolds Sealing and Striping, Inc./McMinnville/CNZ143]

 

REGION 2 The on-call concrete pavement repair at various locations on various Interstate and State Routes: The contractor will be repairing concrete pavement on the ramps at I-24 at Martin Springs Rd exit 143. The 2 EB ramps will be worked on as well as the Martin Springs Rd on-ramp to I-14 WB. This work will require the narrowing of each ramp with a minimum open lane width of 10 feet. Please use caution when driving through the work zones. [Bluegrass Contracting Corporation/Dunlap/CNY295]

 

REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed. [Reynolds Fence and Guardrail, Inc./McMinnville/CNZ112]

 

REGION 2 The sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high traffic state routes, while daytime sweeping can be anticipated between 9 AM to 3 PM for lower traffic state routes. [Sweeping Corporation of America, Inc./Chattanooga West/CNY210]

 

REGION 2 Various Interstate and SRs – Cable Barrier Repair: The contractor will have short term shoulder and/or lane closures in order to perform cable barrier rail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday. At least one travel lane will remain open to traffic at all times. Typically, only a shoulder closure will be used in the median, but lane closures will be employed as needed. [LU, Inc./McMinnville/CNY183]