February 19, 2026 in Top Stories, Traffic & Road Conditions

POTHOLE REPAIRS LEAD TO TRAFFIC CONGESTION ON EASTBOUND I-40 IN CUMBERLAND COUNTY

On February 19, 2026, at 10:11 AM CT, pothole repair work began on Interstate 40 eastbound in Cumberland County, near mile marker 328.
The eastbound left lane (of two) and the left shoulder are fully blocked for safety while crews perform the repairs. Eastbound traffic is reduced to one lane (the right lane), which may cause delays and congestion.
Drivers should slow down, merge early, and stay alert for work zone signs and equipment. This is a typical temporary fix following winter weather damage, with updates available via TDOT resources.


CONTACT INFORMATION

3B Media
105.7 The HOG / Spirit 101.9/ 93.3 The Ranch
94.1 The VIBE / 98.9 The WOLF
37 South Drive
Crossville, TN 38555

Phone: 931-484-1057
Fax: 931-707-0580