June 5, 2019 in Traffic & Road Conditions

TRAFFIC A MESS ON BOTH DIRECTIONS OF INTERSTATE 40 BETWEEN WESTEL AND HARRIMAN

Ongoing construction, paving and maintenance in both directions of Interstate 40 on Rockwood Mountain are resulting in major traffic back ups in both directions.  Traffic detouring off of I40 and on to US Highway 70 will result in heavier than normal congestion between Westel and Rockwood.



CONTACT INFORMATION

3B Media
105.7 The HOG / Spirit 101.9/ 93.3 The Ranch
94.1 The VIBE / 98.9 The WOLF
37 South Drive
Crossville, TN 38555

Phone: 931-484-1057
Fax: 931-707-0580