October 28, 2024 in Education, Top Stories

CC SCHOOL BOARD APPROVES LIGHTING OVERHAUL PLAN

The Cumberland County School Board recently approved a proposal by Excel Energy Group for an LED lighting upgrade plan that is projected to save the school system $242,878 annually.

The new plan is expected to reduce energy usage by up to 60% as well as feature longer lifespans for equipment including bulbs and improve overall lighting quality in each School.

Plans will include the upgrading and or replacement of approximately $13,900 lighting fixtures and associated lamps and ballasts. The initial cost for the plan is projected to be $2,131,919.



CONTACT INFORMATION

3B Media
105.7 The HOG / Spirit 101.9/ 93.3 The Ranch
94.1 The VIBE / 98.9 The WOLF
37 South Drive
Crossville, TN 38555

Phone: 931-484-1057
Fax: 931-707-0580