LOCAL ROADWAY ACTIVITY REPORT (SEPTEMBER 17-23, 2026)
CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: Construction continues within the median of I‑40. Traffic shifted along the project route. Motorists should use caution.
[Rogers Group, Inc./Crossville/CNZ290]
CUMBERLAND COUNTY I-40 [306.2-311] from MM 306.2 to MM 311 resurfacing: Contractor continues resurfacing on I‑40 nightly Sunday–Friday from 7 PM to 6 AM. Motorists should use caution.
[Rogers Group, Inc./Crossville/CNZ327]
CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair: Contractor continues bridge repair on I‑40 at MM 304.6 / SR‑24 at LM 0.24. SR‑24 reduced to one lane with temporary signals. Use caution.
[Rogers Group, Inc./Crossville/CNZ290]
CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR‑24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR‑462 and SR‑1. The contractor is performing general clearing and utility work; once completed, they will proceed with replacement of the bridge over the Obed River. Motorists should use caution and follow the posted detour. RESTRICTIONS: Both lanes of SR‑24 are closed at LM 15.06 to LM 15.6.
[Mid-State Construction Company, Inc./Crossville/CNZ206]
CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activity throughout the project. Lawson Road remains closed with a detour along Tabor Road. Paving operations continue, and motorists should be mindful of additional equipment and trucks entering/exiting the work zone. Temporary lane closures and periodic traffic stoppages may be necessary. Flaggers and advance warning signs will accompany closures. Motorists should use caution.
[Jones Bros. Contractors, LLC/Crossville/CNV009]
CUMBERLAND COUNTY SR-28 [12.61-14.96] from near SR-392 to near US-70 resurfacing: The contractor continues final project activities on SR‑28 (Main Street) between SR‑392 (Miller Ave.) and SR‑24 (Elmore Rd.). Work may be scheduled nightly Sunday–Friday from 7 PM to 6 AM. Temporary lane closures and flaggers will be utilized. Motorists should be aware of the work zone and seek alternate routes. [Rogers Group, Inc./Crossville/CNZ291]
FENTRESS COUNTY SR-28 [16.89-19.83] from south of York Highway to north of SR-52 resurfacing: Intermittent lane closures will occur throughout resurfacing work. Flaggers will assist with traffic control. Motorists should use caution, follow signage, and watch for construction equipment. [Rogers Group, Inc./Livingston/CN26204]
FENTRESS COUNTY SR-62 (W. DEER LODGE HWY.) Utility Work both directions from LM 0.00 to LM 10.40: Flagger‑assisted lane closures on SR‑62 (Clarkrange–Monterey Hwy) between Short Dr. and SR‑262. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones present 09/14/2026 through 10/16/2026 from 9 am to 2 pm [2026‑382]
MORGAN COUNTY, SR 62 over Little Clear Creek: Motorists should be alert for possible lane closures at various times through this project. Motorists should be alert for workers present, changing conditions, and use extreme caution through this area.
ROANE COUNTY, I-40 East between Mile Markers 340 and 341: Motorists should be alert for closed shoulders, reduced speeds, and use extreme caution through this project.
ROANE COUNTY, US 27 at SR 61: Motorists should be alert for new traffic patterns and possible lane closures at various times through this project. Motorists should be alert for workers present, changing conditions, and use extreme caution through this area.
