TRAFFIC BACKUPS WILL CONTINUE ON I-40 EASTBOUND IN CUMBERLAND CO.

Crews with the Tennessee Department of Transportation continue to work to repair a bridge in I-40 at the 328 mile marker eastbound over Highway 70. Traffic is down to one lane creating heavy traffic backups for motorists going east. Delays can and should be expected daily and a completion date was not released. TDOT says tractor trailer loads wider than 16 feet should seek an alternate route. A detour route of taking the Peavine Road exit (Exit 322), turning right and then left at the 4-way stop onto Highway 70 East can be used to get back on I-40 in Crab Orchard. Be advised just before you get into Crab Orchard, underneath the bridge being worked on is down to one lane.

Westbound traffic at the scene on I-40 is running normal.

UPCOMING EVENTS
Current Month

ANDREA BOCELLI COMES TO KNOXVILLE IN FEBRUARYTHOMPSON-BOLING ARENA2025sat08febAll Day(All Day: Saturday)

CONTACT INFORMATION

3B Media
105.7 The HOG / Spirit 101.9/ 93.3 The Ranch
94.1 The VIBE / 98.9 The WOLF
37 South Drive
Crossville, TN 38555

Phone: 931-484-1057
Fax: 931-707-0580