February 6, 2026 in Top Stories, Traffic & Road Conditions

WEEKLY LOCAL AREA ROADWAY ACTIVITY REPORT (FEB 5 – 11)

– ANDERSON COUNTY, SR 61 between Bill Key Lane and Old Batley Road: Motorists should be alert for possible daily lane closures during daylight hours through this construction project. Motorists should be alert for slowed or stopped traffic, expect potential delays, and use extreme caution through this area.

– BLOUNT COUNTY, SR 162 Pellissippi Parkway between Cusick Road and SR 33: SR 162 is reduced from two lanes to one through this project as construction crews perform bridge work in this area. Motorists should be alert for possible brief rolling roadblocks between the hours of 9 a.m. and 3 p.m. daily, as needed, for blasting operations. Motorists should be alert for changed conditions; workers present and use extreme caution through this area.

– BLOUNT COUNTY, SR 35 between East Broadway Avenue and Ellis Avenue: Through February 28, 2026, motorists should be alert for possible lane closures between the hours of 9 a.m. and 3 p.m. as crews perform drainage structure replacements. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– BLOUNT COUNTY, US 129/ SR 115 Tail of the Dragon: Due to the one lane condition of Interstate 40 near the Tennessee and North Carolina State Line as repairs continue from Hurricane Helene, this is a reminder for commercial vehicles in Tennessee and North Carolina attempting to use US 129 as an alternate around the I-40 work zone. No trucks with trailers over 30 feet in length, or single units over 30 feet in length are permitted on US 129 “The Dragon” in Tennessee or North Carolina. Thru truck traffic in Tennessee should follow I-81 North to I-26 East into North Carolina. These restrictions of US 129 will be strictly enforced day and night.

– BRADLEY COUNTY I-75 [15.35-19.309] from MM 31 to MM 35 (McMinn County Line) resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNY261]

– BRADLEY COUNTY SR-60 widening from the 4-lane north of I-75 (LM 17.2) to SR-306 (LM19.9): During this reporting period, the contractor will perform punch list work on SR-60 in Bradley County. Intermittent lane closures may be necessary while work occurs. [Summers-Taylor, Inc./Cleveland/CNV130]

– BRADLEY COUNTY SR-74 (SPRING PLACE RD.) Utility Work both directions from LM 11.07 to LM 11.14: Flagging-assisted lane closures on SR-74 (Spring Place Rd) between Clayton LN and Durkee RD SE Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 12/18/25 through 06/18/2026 from 9 am – 2 pm [2025-736]

– BRADLEY COUNTY SR-74 [11.445-11.83] from Whaley Road to SR-60 APD-40 drainage improvements: During this reporting period, the contractor will continue storm drain installation and grading work on SR-74. Intermittent flagging operations and shoulder closures will be necessary periodically. Motorists should use caution and reduce speed when traveling through the work zone. [APAC – Atlantic, Inc./Cleveland/CNZ243]

– CAMPBELL COUNTY, I-75 South near Mile Marker 140.1: On Monday, February 9, 2026, motorists should be alert for possible lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– COCKE COUNTY, I-40 East between Mile Marker 446 and North Carolina State Line: I-40 East is reduced to 1 lane between Mile Marker 446 in Tennessee and Mile Marker 7 in North Carolina due to damage sustained during Hurricane Helene. Traffic wider than 8 ½ feet is prohibited through this area. Wide Loads should follow I-81 North to I-26 East or I-77 South. This area remains a heavily active construction zone as permanent repairs continue. Motorists should be alert for workers and construction equipment entering and exiting the roadway in this work zone. Motorists should be alert that there are areas with no shoulders, and no emergency pull-off locations through this work zone. There are no services in this area. Motorists should ensure they have plenty of fuel and vehicles are in good mechanical condition traveling through this area. Motorists should expect potential long delays. Motorists should be prepared to stop and be alert for slow or stopped traffic. Motorists should use extreme caution and avoid all distractions traveling through this area. I-40 “Thru Traffic” should continue to follow I-81 North to I-26 East or I-77 South to avoid potential major delays. For current road conditions, go https://smartway.tn.gov/

– COCKE COUNTY, US 25/70 between Tennessee State Line and Hot Springs, North Carolina: Thru truck traffic is prohibited on US 25/70 in North Carolina between the Tennessee State Line and Hot Springs, North Carolina. Truck traffic to North Carolina should follow I-81 North to I-26 East or I-77 South.

– COFFEE COUNTY I-24 (MM 117) construction of an overpass carrying Wattendorf Memorial Highway/AEDC Road, including grading, drainage, retaining walls, and paving: Drivers can expect short-term flagging operations for trucks entering and exiting the work zone on Wattendorf Highway. Please use caution when traveling through the work zone. [Jones Bros. Contractors, LLC/Tullahoma/CNZ029]

– COFFEE COUNTY I-24 TDOT Contractor eastbound at MM 115.5: On 02/06/2026 from 9 PM to 12:30 AM, the fast lane/number one lane at I-24 EB MM 115.5 will be closed for a hazmat cleanup. Traffic control will be in place with THP present. Motorists are asked to slow down, move over, and use caution.

– COFFEE COUNTY SR-2 (HILLSBORO RD.) Utility Work both directions at LM 16.95: Northbound and Southbound Lane closures on SR-22 (Hillsboro Blvd) between Doak Rd and Asbury RD. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 02/11/2026, with a rain date of 02/12/2026 from 9 am – 2 pm. [2025-785]

– COFFEE COUNTY SR-55 construction from First Avenue (LM 2.0) to SR-16 (US-41A, N. Jackson St, LM 2.6) in Tullahoma: Phase 1 of roadway widening and bridge replacement on SR-55 (Wilson Ave.) will continue this week. The contractor may use temporary lane shifts to complete storm structure installations. Phase 1 traffic shift has reduced lanes from 3 to 2 from Cedar Lane to near Grau Lane in order to continue bridge replacement and storm drainage work. [Dement Construction Company, LLC/Tullahoma/CNX912]

– CUMBERLAND AND FENTRESS COUNTY SR-28 (US-127) widening from near N. Lowe Rd (LM 29.2) to north of SR-62 (LM 1.9): The contractor has shifted traffic to phase 2 on the newly constructed portions of SR-28 LM 0.90 to 1.98 in Fentress County. Work will proceed with the existing alignment of SR-28. Flaggers are being used intermittently as needed to control traffic through the work zone. Motorists are encouraged to use caution, be aware of new traffic signs and pavement markings, and watch for construction equipment and personnel throughout the project. [Jones Bros. Contractors, LLC/Cookeville/CNV300]

– CUMBERLAND COUNTY I-40 [304.4-306.6] from MM 304.4 to MM 306.6 bridge repair and resurfacing: The contractor has started working on the bridge repair on I-40 at MM 304.6. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]

– CUMBERLAND COUNTY SR-24 (US-70 N.) Utility Work both directions at LM 7.90: Northbound and Southbound Lane closures on SR-24 (HWY 70 N.) between Miller Ct and Newberry Rd. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 02/11/2026 with a rain date of 02/12/2026 from 9 am – 2 pm. [2025-1008]

– CUMBERLAND COUNTY SR-24 [0-0.16] from Putnam County Line to C189 bridge repair: The contractor has started working on the bridge repair on I-40 at MM 304.6 or SR-24 at LM 0.24. The contractor is working behind the guardrail. Once additional work begins, additional lane closures may be necessary. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]

– CUMBERLAND COUNTY SR-24 [15.056-15.56] from Crossville city limits to Seventh-Day Adventist Church and School bridge replacement: The contractor has closed SR-24 at LM 15.06 to LM 15.6. This closure will remain in place for the duration of the project. The posted detour is along SR-462 and SR-1. The Contractor will be working on general clearing activities and utility work initially. Once initial work is completed, the Contractor will proceed with the replacement of the bridge over the Obed River. Motorists should use caution and utilize the posted detour. RESTRICTIONS: Both lanes of SR-24 are closed from LM 15.06 to LM 15.6. [Mid-State Construction Company, Inc./Crossville/CNZ206]

– CUMBERLAND COUNTY SR-28 (US-127 S.) Utility Work both directions from LM .44 to LM 5.94: Northbound and Southbound Lane closures on SR-28 (HWY 127 S.) between Lowes Gap Rd. and Willard Brown Rd. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 10/30/25 through 02/25/2026 from 9 am – 2 pm. [2025-659]

– CUMBERLAND COUNTY SR-28 (US-127) bridge construction and paving from north of I-40 (LM 17.8) to near Potato Farm Road (LM 22.7): The contractor continues grading activities throughout the project limits. Temporary lane closures and/or periodic traffic stoppages will be necessary for construction activities. The contractor has opened North Grace Hill Drive at the existing intersection of SR-28 (US-127) for construction activities. The contractor has scheduled to close Lawson Road at the intersection of Cline Road to install a drainage pipe beginning on 02/09/26. A detour will be posted to utilize Tabor Loop. Flaggers and advanced warning signs will accompany any closures. Motorists should use caution when traveling through the work zone as traffic patterns change. [Jones Bros. Contractors, LLC/Crossville/CNV009]

– DEKALB COUNTY SR-26 (US-70) grading, drainage, and construction of retaining walls and paving from near SR-53 (LM 2) to near SR-96 (LM 6.1): The contractor will continue normal working activities throughout the project limits. During this work, temporary lane closures are possible, and flaggers will be present. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway. [Twin K Construction/Cookeville/CNV012]

– FRANKLIN COUNTY SR-15 (S. COLLEGE ST.) Utility Work both directions at LM 16.05: Flagging-assisted lane closures on SR-15 (South College St.) between Highland Rd and Country Club Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 02/02/2026 through 02/06/2026 from 9 am – 2 pm [2025-558)

– GRAINGER COUNTY, SR 131 between Log Miles 7 and 8: Motorists should be alert for lane closures through this construction project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– GREENE COUNTY, I-81 South near Mile Marker 33.5: On Sunday, February 8, 2026, motorists should be alert for possible lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– GREENE COUNTY, US 11E /SR 34 at Snapps Ferry Road: Motorists should be alert for possible lane closures at various times through this bridge repair project. Motorists should be alert for workers present, expect delays, and use extreme caution through this area.

– GRUNDY COUNTY I-24 TDOT Maintenance eastbound from MM 131 to MM 133: TDOT Grundy maintenance has hired a contractor to remove downed trees on the ROW along EB I-24 from MM 132 to MM 132.5 in Grundy County. The contractor will set up a shoulder closure for this work. Location of work: I-24 EB shoulder closure from MM 131.5 to 133 Date: Thursday and Friday (02/05/26 and 02/06/26) Time: Start at 9 am and end at 3 pm. TDOT will request support from THP during this operation.

– HAMBLEN COUNTY, I-81 North and South between Mile Markers 8 and 18: On Friday, February 6, 2026, motorists should be alert for possible mobile lane closures between the hours of 9 a.m. and 4 p.m. as crews perform roadway maintenance activities. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– HAMBLEN COUNTY, US 11E/ SR 34 near Depot Street and Jay Bird Road: Motorists should be alert for temporary lane closures and brief stoppages by flagging personnel at various times through this construction project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– HAMILTON COUNTY I-124 Utility Work, both directions at MM 12.93: Flagging-assisted lane closures on South Terrace between Brookfield Ave and S. Sweetbriar Ave. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/29/2026 through 02/04/2026 from 9 am – 2 pm [2025-961)

– HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: Nightly Lane closures will regularly occur on this project, 9 PM to 6 AM, on I-75 North and South between Exit 1 (East Ridge) and Exit 3A (East Brainerd Road/ SR-320) and on I-24 East and West from Germantown Road to Spring Creek Road, MM182 to MM185, for various construction activities. These closures may temporarily reduce traffic to a single lane. Uniformed police officers will be present in these work zones to assist with traffic management and to enforce traffic laws. Nighttime lane closures from 8 PM to 6 AM are scheduled on I-24 East and West between Germantown Road and through the I-75 interchange for placement of permanent thermoplastic pavement markings and work on punch list items. This night work will continue weekly from Sunday through Thursday during the months of January and February. The contractor will start daytime closures (9 AM to 3 PM) on North and South Terrace for various pavement repairs, milling and final pavement. This work is scheduled to take place Monday through Friday, weather permitting, and will occur weekly through February until completed. As this work on North and South Terrace progresses it will be necessary to temporarily close exit and entrance ramps from I-24 so that crews can safely pave these areas. Paving crews are currently working on North Terrace, the exit and entrance ramps from I-24 West between South Moore Road and Belvoir Avenue are scheduled for temporary closure (9 AM to 3 PM) on Tuesday (2/3) and Wednesday (2/4) weather permitting. The contractor is also planning to close exit and entrance ramps during the day (9 AM to 3 PM) for the next week to complete finishing/staining of ramp retaining and noise walls. These closures are scheduled as follows: Tuesday (2/3) entrance ramp to I-24 East (between S. Moore Road and McBrien Road), Wednesday (2/4) & Thursday (2/5) the exit ramp from I-24 West (between McBrien Road and S. Moore Road) and Friday (2/6) & Monday (2/9) the exit and entrance ramps from I-24 West (between S. Moore Road and Belvoir Avenue). Message boards, signs and detours will be provided to warn motorists of these closures and to guide them to the next available exit or entrance ramp. On Wednesday (2/4) and Thursday (2/5) the contractor will have nighttime lanes closures (9 PM to 6 AM) on I-75 South and North near the East Brainerd Road interchange (Exit 3) for work on various items (i.e. erosion control repairs, overhead sign installation, moving/adjusting portable concrete barrier rail, etc.). The contractor will also be implementing the weekend closure of a single traffic lane in each direction (North and South) of I-75 near the East Brainerd Road (Exit 3) interchange. Closing these lanes will allow the contractor to safely access and complete the remaining median concrete pavement for the new bridge over the CSX railroad under construction on I-75. On Friday, February 6th beginning at 9 PM and ending on Sunday at 6 AM the contractor will be closing a single inside lane next to the median on I-75 South. On Saturday, February 7th beginning at 7 PM and ending on Monday, February 9 at 6 AM a single inside lane next to the median will be closed on I-75 North. Both the I-75 South and I-75 North lanes will be reopened by Monday (2/9) morning. Due to winter weather and cold temperatures, there is a contingency plan to close these lanes on I-75 South and North next weekend from Friday, February 13 at 9 PM until 6 AM on Monday, February 16 if needed to complete this work. Most of the remaining work items on this project are temperature and weather sensitive. If any of them are canceled due to inclement conditions, they will be rescheduled to take place on the next available day and time when adequate conditions exist. It may also be necessary to do short duration (15 to 30 minutes) rolling roadblocks during the day or night for patching potholes, clearing debris or repairing guardrail, attenuators, etc. [Wright Brothers Construction Company, Inc./Maj Prj – Blevins/DB2101]

– HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR-153 southbound ramp to I-75 northbound has been reduced to one lane. Traffic shifts have been implemented on I-75 northbound, Shallowford Road entrance ramps, and Shallowford Road exit ramps and Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and storm drainage installation between the intersections near Markman’s Jewelers and Texas Roadhouse. On the nights of 02/09/25 through 02/12/26 from 10 PM to 6 AM the I-75 NB Exit 5 Ramp to Shallowford Road will be closed for bridge girder erection. The speed limit has been reduced on I-75 throughout the project limits. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel. [Summers-Taylor, Inc./Chattanooga West/CNX358]

– HAMILTON COUNTY SR-17 (BROAD ST.) Utility Work both directions from LM 1.12 to LM 1.77: Flagging-assisted lane closures on SR-17 (St. Elmo Ave.) between Tennessee Ave. and W 45th St. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/29/2026 to 02/05/2026 from 9 am – 2 pm [2025-905)

– HAMILTON COUNTY SR-17 (ST. ELMO AVE.) Utility Work both directions at LM .74: Flagging-assisted lane closures on SR 17 (St. Elmo Hwy) between 51st St and 49th Ave. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/15/2026 through 02/18/2026 from 9 AM to 2 PM [2025-696]

– HAMILTON COUNTY SR-2 (BROAD ST.) Utility Work both directions from LM 6.17 to LM 6.66: Flagging assisted lane closures on SR-41 (Broad St.) between Williams St. and St. Elmo Ave. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/29/2026 to 02/05/2026 from 9 am – 2 pm [2025-907)

– HAMILTON COUNTY SR-2 (CUMMINGS HWY.) Utility Work both directions from LM .67 to LM .70: Flagging assisted lane closures on SR-002 (Cummings HWY.) between Kelly’s Ferry Rd and W. Hills Dr. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 02/09/2026 through 02/13/2026 from 9 am – 2 pm [2025-1007)

– HAMILTON COUNTY SR-2 (CUMMINGS HWY.) Utility Work both directions from LM 069 to LM .79: Flagging assisted lane closures on SR-2 (Cummings HWY) between Hills Dr., and 4347 Cummings HWY. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/22/2026 through 02/18/26 from 9 am – 2 pm [2025-648]

– HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 18.80 to LM 18.86: Flagger-assisted lane closures on SR-2 (Lee Hwy) between McCutcheon Rd and Elm Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 10/2/25 to 02/28/2026 from 9 am – 2 pm. [2024-338]

– HAMILTON COUNTY SR-2 (LEE HWY.) Utility Work both directions from LM 18.80 to LM 18.86: This is nighttime work. Flagger assisted lane closures on SR-2 (Lee Hwy) between McCutcheon Rd and Elm Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 02/06/2026 through 02/08/2026 from 9 am – 2 pm. [2024-338]

– HAMILTON COUNTY SR-320 (E. BRAINERD RD.) Utility Work in both directions from LM 1.36 to LM .92: Flagging assisted lane closures on SR-320 (East Brainard Rd.) between Glenbury Court and Benham Dr. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/29/2026 to 02/05/2026 from 9 am – 2 pm [2025-901)

– HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 4.46: Flagging assisted lane closures on SR-321 (Ooltewah Ringgold Rd) between Collier Pl. and Bill Reed Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 02/02/26 through 02/05/26 from 9 am – 2 pm with a Rain Date of 02/06/2026 [2025-623]

– HAMILTON COUNTY SR-58 (HWY. 58) Utility Work both directions from LM 1.66 to LM 2.16: Flagging-assisted lane closures on SR-58 (Hwy 58) between Everett St. and St. Elmo Ave. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/29/2026 to 02/05/2026 from 9 am – 2 pm [2025-906)

– HANCOCK COUNTY, SR 31 between Log Miles 5.5 and 6.0: Motorists should be alert for temporary lane closures at various times through this construction project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– HAWKINS COUNTY, SR 70 between Coran Road and SR 66: SR 70 is closed to thru traffic and detoured around this bridge replacement project over the railroad. Motorists should be alert for changing traffic patterns, follow signed detour routes, adjust travel times, and use extreme caution through this area. This project is estimated to be completed on or before April 30, 2027.

– HAWKINS/ SULLIVAN COUNTY, US 11W /SR 1 Bridge over N. Fork Holston River: Motorists should be alert for possible lane closures during daylight hours as crews perform geotechnical work through this area. Motorists should be alert for workers present, expect delays, and use extreme caution through this area.

– JACKSON COUNTY SR-135 (DODSON BRANCH HWY.) TDOT Maintenance northbound from LM 11.8 to LM 12.0: SR135 will be reduced to one lane due to a soil nail project starting 2/5/26 until the project is completed. Traffic signals are in place. Motorists are encouraged to slow down and use caution when in the area.

– JEFFERSON COUNTY, I-81 North near Mile Markers 0.2 and 5.2: On Sunday, February 8, 2026, motorists should be alert for possible lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– KNOX COUNTY, I-75 North and South near Exit 112 Emory Road: Motorists should be alert for shoulder closures in place through this area. Motorists should be alert for possible temporary lane closures nightly between the hours of 7 p.m. and 6 a.m. the following morning the ramps at this exit as crews perform roadway construction activities on this DDI project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– KNOX COUNTY, SR 131 Emory Road between Blueberry Road and Dannaher Drive: Motorists should be alert for shoulder closures in place through this area. Motorists should be alert for possible temporary lane closures nightly between the hours of 7 p.m. and 6 a.m. the following morning as crews perform roadway construction activities on this DDI project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– KNOX COUNTY, US 129/SR 115 Alcoa Highway between Woodson Drive and Cherokee Trail: Motorists should be alert for possible temporary nightly lane closures from 7 p.m. to 6 a.m. the following morning as crews perform roadway construction between Woodson Drive and Cherokee Trail. Motorists should be alert for crews intermittently pacing traffic between Woodson Drive and Cherokee Trail on Alcoa Highway (US 129/State Route 115) daily, as needed, to move equipment and materials within the project limits and to conduct routine roadway maintenance. Disruptions to traffic flow are anticipated to be short in nature. Motorists should be alert for workers present, reduce speed, be alert for slow or stopped traffic, and use extreme caution through this construction project. For project information, go to https://www.tn.gov/tdot/projects/projects-region-1/sr115-us-129-alcoa-highway.html

– KNOX COUNTY, US 441/ SR 71 between Simpson Road and Hendron Chapel Road: Motorists should be alert for possible lane closures, workers present, changed conditions, expect potential delays, and use extreme caution through this construction project.

– KNOX COUNTY, Various Interstates through Knoxville: Motorists should be alert for possible mobile lane closures nightly between the hours of 8 p.m. and 6 a.m. the following morning as crews perform roadway maintenance activities. Motorists should be alert for workers present, slow or stopped traffic, and use extreme caution in this area.

– LOUDON COUNTY, US 11/SR 2 between North Street and Martin Drive: Motorists should be alert for possible lane closures daily between the hours of 6 a.m. and 6 p.m. through this curb replacement project. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

– LOUDON COUNTY, US 11/SR 2 between US 70/SR 1 and US 321: Motorists should be alert for possible lane closures daily between the hours of 9 a.m. and 3 p.m. through this utility project. Motorists should be alert for workers present, slow or stopped traffic, expect delays, and use extreme caution through this area.

– LOUDON/ ROANE COUNTY, SR 95 Bridge over Clinch River: Beginning Monday, February 9, 2026, the SR 95 Bridge over the Clinch River will be reduced to one lane controlled by a temporary traffic signal as crews begin this bridge repair project. This closure will remain in place around the clock. Motorists should be alert for new traffic patterns, be prepared to stop, expect delays, and use extreme caution through this area. A wide-load detour will be in place. To avoid delays, motorists should consider alternate routes.

– MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will be performing slide mitigation operations, including grading, drainage and paving on SR-108 in Marion County at LM 2.8. The roadway will be reduced to one lane controlled by temporary traffic signals. The project completion date is 08/31/2027. Please use caution when driving through the work zone. [Wright Brothers Construction Company, Inc./Dunlap/CNZ226]

– MARION COUNTY SR-2 [17.2-17.3] from 17.2 to 17.3 construction: The contractor will be performing grading and drainage operations on SR-2 in Marion County near LM 17.25. This work will require a lane shift for EB traffic, the WB traffic will be unaffected. Please slow down and use caution when driving through the work zone. [Talley Construction Company, Inc./Dunlap/CNZ244]

– MCMINN COUNTY I-75 [0-2.06] from MM 35 (Bradley County Line) to MM 37 resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNY261]

– MCMINN COUNTY I-75 [2.06-4.32] from MM 37 to MM 39.5 resurfacing: The contractor will continue paving operations. This work will require temporary lane closures in both directions, which will occur Sunday nights through Friday nights 8 PM to 6 AM. Motorists should exercise caution and pay attention to construction signage. The speed limit will be reduced during paving operations. [Wright Brothers Construction Company, Inc./Chattanooga West/CNZ109]

– POLK COUNTY SR-33 (HWY. 411) Utility Work both directions from LM 2.83 to LM 5.35: Flagger- assisted lane closures on SR-33 (411 Hwy) between Ridge Rd and Waters Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, 01/12/2026 through 02/13/26 from 8 am – 3 pm. [2023-855]

– POLK COUNTY SR-68 over SR-40 the construction of bridges: During this reporting period, the contractor will begin construction on the SR-68 South bridge. Beginning 02/06/26, all SR-68 traffic will use the newly constructed SR-68 North bridge while construction occurs on the new SR-68 South bridge. All SR-40/SR-68 interchange traffic will utilize the SR-68 North interchange ramps. A temporary 3-way stop has been implemented at the intersection of the SR-40 interchange ramp and SR-68. Motorists are encouraged to slow down when entering the construction zone and look out for new stop signs on SR-68 near the SR-40/SR-68 interchange. The contractor will begin demo on the existing SR-68 South bridge from 6 PM to 6 AM nightly 02/09/26 – 02/11/26. During this work, a temporary traffic shift will be in place on SR-40. Flaggers will be present to assist with traffic control around the work area. Please use extra caution when traveling through the work zone during these hours. [Wright Brothers Construction Company, Inc./Cleveland/CNZ042]

– PUTNAM COUNTY I-40 [303.6-304.2] from MM 303.6 to MM 304.2 bridge repair and resurfacing: The contractor has started working on the bridge repair on I-40 at MM 304.6. Motorists should use caution in the area. [Rogers Group, Inc./Crossville/CNZ290]

– PUTNAM COUNTY SR-136 construction from north of the SR-111 interchange to south of the I-40 interchange: The contractor will continue normal working activities throughout the project limits. During this work, temporary lane closures are possible, and flaggers will be present. Motorists are encouraged to use caution while traveling through the work zone and should be aware of construction equipment adjacent to the roadway. [Rogers Group, Inc./Cookeville/CNV284]

– PUTNAM COUNTY SR-24 (CROSSVILLE HWY.) Utility Work both directions from LM 35.55 to LM 38.09: Eastbound and Westbound Lane closures on SR-24 (Crossville Hwy.) between E. Wilder Ave. and Walker Farm Rd. Motorists should reduce speed and be prepared to stop. Arrow board/message boards, flaggers, and barrels/cones will be present, 11/06/25 through 05/06/2026 from 9 am – 2 pm. [2025-521]

– REGION 2 On-Call Signing on Various Interstate and State Routes: The contractor will be replacing overhead signs on I-24 EB in Marion County. This work will require a single right lane closure, leaving the left lane/s open to traffic. The lane closure will begin at I-24 EB at MM 135.4 and end near MM 136.4. The work will take place on 02/05/26 – 02/06/26 and be from 8 PM – 6 AM. Please use caution when driving through the work zone. [LU, Inc./Dunlap/CNZ134]

– REGION 2 The on-call cable barrier repair on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform cable barrier rail repair. These closures will take place daily Monday through Friday during daylight hours on the interstates and some major divided highway state routes. There many also be nightly Sunday through Thursday from 7 PM to 6 AM, rarely and only as needed. At least one travel lane will remain open to traffic at all times. Typically, only a shoulder closure will be used in the median, but lane closures will be employed as needed. [LU, Inc./McMinnville/CNZ205]

– REGION 2 The on-call guardrail repair and new guardrail installation on various Interstate and State Routes: The contractor will have short-term shoulder and/or lane closures in order to perform guardrail repair. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM and daily Monday through Friday on state routes. At least one travel lane will remain open to traffic at all times on the interstate, and flaggers will be present on state routes during any work that is performed. [Reynolds Fence and Guardrail, Inc./McMinnville/CNZ112]

– REGION 2 The sweeping on various Interstate and State Routes: Sweeping operations are planned throughout Region 2 this reporting period. Sweeping operations are mobile operations along the inside and outside shoulders with impacts to adjacent traffic lanes. These operations will occur at night between 8 PM and 6 AM for interstates and high traffic state routes, while daytime sweeping can be anticipated between 9 AM to 3 PM for lower traffic state routes. [Sweeping Corporation of America, Inc./Chattanooga West/CNY210]

– REGION 2 Various Interstate and SRs – Cable Barrier Repair: The contractor will have short-term shoulder and/or lane closures in order to perform cable barrier rail repair for punch list operations. These closures will take place on the interstate nightly Sunday through Thursday from 7 PM to 6 AM as needed and daily Monday through Friday. At least one travel lane will remain open to traffic at all times. Typically, only a shoulder closure will be used in the median, but lane closures will be employed as needed. [LU, Inc./McMinnville/CNY183]

– RESTRICTIONS CUMBERLAND COUNTY – CNZ206: Both lanes of SR-24 are closed at LM 15.06 to LM 15.6.

– RHEA COUNTY SR-30 (DAYTON MTN. HWY.) Utility Work both directions from LM .13 to LM 2.22: Flagging assisted lane closures on SR-30 (Dayton Mtn HWY) Between Walker Rd. and Tigues Creek Rd. Motorists should reduce speed and be prepared to stop. Trucks, signage, flaggers, and barrels/cones will be present, 01/12/2026 through 02/27/2026 from 9 am – 2 pm [2025-725]

– ROANE COUNTY, I-40 East near Mile Marker 344.6: On Monday, February 9, 2026, motorists should be alert for possible lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– ROANE COUNTY, I-40 West between Mile Markers 352 and 351: On Tuesday, February 10, 2026, motorists should be alert for possible lane closures between the hours of 8 p.m. and 6 a.m. the following morning as crews perform guardrail repairs. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– ROANE COUNTY, US 27 at SR 61: Motorists should be alert for new traffic patterns and possible lane closures at various times through this project. Motorists should be alert for workers present, changing conditions, and use extreme caution through this area.

– ROANE/ LOUDON COUNTY, SR 95 Bridge over Clinch River: Beginning Monday, February 9, 2026, the SR 95 Bridge over the Clinch River will be reduced to one lane controlled by a temporary traffic signal as crews begin this bridge repair project. This closure will remain in place around the clock. Motorists should be alert for new traffic patterns, be prepared to stop, expect delays, and use extreme caution through this area. A wide-load detour will be in place. To avoid delays, motorists should consider alternate routes.

– SCOTT COUNTY, SR 29 North near Log Mile 18.6: Beginning Monday, February 9, 2026, motorists should be alert for lane closures left in place through this slide repair project. Motorists should be alert for workers present, lane shifts, expect potential delays, and use extreme caution through this area.

– SULLIVAN COUNTY, I-81 North near Mile Marker 67: On Friday, February 6, 2026, motorists should be alert for possible lane closures between the hours of 7 a.m. and 7 p.m. as crews perform roadside maintenance activities. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– SULLIVAN COUNTY, SR 93 at Bloomingdale Road: Motorists should be alert for possible lane closures at various times through this signal upgrade project. Motorists should be alert for workers present, expect potential delays, and use extreme caution through this area.

– SULLIVAN COUNTY, SR 93 between Murrell Road and SR 347: Motorists should be alert for possible lane closures through this project. Motorists should expect potential delays, be alert for slow or stopped traffic, and use extreme caution through this area.

– SULLIVAN/ HAWKINS COUNTY, US 11W /SR 1 Bridge over N. Fork Holston River: Motorists should be alert for possible lane closures during daylight hours as crews perform geotechnical work through this area. Motorists should be alert for workers present, expect delays, and use extreme caution through this area.

– UNICOI COUNTY, SR 107 Bridge over North Indian Creek at Log Mile 5.2: SR 107 bridge is closed to thru traffic and detoured around this project. Motorists should be alert for changing traffic patterns, follow signed detour routes, adjust travel times, and use extreme caution through this area.

– UNICOI COUNTY, SR 173 Intersection at SR 107: SR 173 is reduced to one lane controlled by temporary traffic signals. Motorists should be alert for changing traffic patterns, workers present and use extreme caution through this project.

– UNION COUNTY, SR 33 between Knox County Line and SR 144: Motorists should be alert for new lane shifts through this project. Motorists should be alert for possible lane closures at various times through this construction widening project. Motorists should be alert for new traffic patterns, lane shifts, workers present and use caution through this area.

– WASHINGTON COUNTY, SR 353 Bridge over the Nolichucky River: The SR 353 Bridge over the Nolichucky River is closed due to damage sustained during recent storm events. Motorists should seek alternate routes around this area. For current road conditions, go https://smartway.tn.gov/

– WHITE COUNTY SR-111 [15.25-16.25] from O’Connor Rd to Old Kentucky Rd culvert replacement: The left lane of both the Northbound and Southbound side of SR-111 are closed until further notice. At this time the contractor will be constructing median crossovers to allow for later work to be completed. Motorists are encouraged to use caution as they approach the work zone, and they should be prepared to stop. Motorists should also be aware that the posted speed limit will be reduced within the work zone when work begins. [Rogers Group, Inc./Cookeville/CNZ902]



CONTACT INFORMATION

3B Media
105.7 The HOG / Spirit 101.9/ 93.3 The Ranch
94.1 The VIBE / 98.9 The WOLF
37 South Drive
Crossville, TN 38555

Phone: 931-484-1057
Fax: 931-707-0580